FieldNews
Subscribe
Industry Glossary Term

Net Hydrocarbon Pay

The thickness of a reservoir zone that actually contains producible oil or gas. Operators use this measurement to justify well completions and production decisions. Higher net pay typically drives more field service activity, from perforating to stimulation work.

Related Terms

VRU (Vapour Recovery Unit)

Industry

A compression system that captures hydrocarbon vapours from storage tanks or production equipment instead of venting them. Subcontractors are often hired to install, maintain, or service VRUs to meet emissions regulations. Familiarity with VRU work is increasingly required on oil and gas production sites.

Bentonite

Industry

A natural clay mineral used in drilling fluids to stabilise boreholes and suspend drill cuttings. Subcontractors handling bentonite slurry must follow site-specific mixing and disposal procedures. Improper handling can trigger environmental compliance issues and project delays.

Work Order

Industry

A formal document issued by a client or general contractor authorising a subcontractor to perform a specific scope of work. It outlines the job details, location, timeline, and agreed rate. Subcontractors typically cannot invoice without a valid work order number.

Caustic Service

Industry

Work involving equipment or piping that handles highly alkaline chemicals, such as sodium hydroxide. Subcontractors must use compatible materials and certified personnel to avoid rapid corrosion and serious chemical burns. Specialised PPE and handling procedures are typically required by the client's safety plan.

500-Kv Transmission Line

Industry

A high-voltage power line carrying 500 kilovolts, typically built to move bulk electricity across long distances. Subcontractors on these projects must hold specialised high-voltage certifications and follow strict safety exclusion zones. Work scopes often include tower erection, conductor stringing, and ground grid installation.

Rig Release

Industry

The formal point when a drilling rig is demobilised and the operator ends the rig contract. For subcontractors, it signals the close of associated scopes of work and triggers final invoicing. Crew demob, equipment retrieval, and close-out documentation should begin immediately.

Stay sharp on field operations

Industry news and insights, delivered to your inbox.

Subscribe to FieldNews
A community project by Aimsio