FieldNews
Subscribe
Industry Glossary Term

Hydroblasting

High-pressure water jetting used to clean, strip, or cut surfaces on industrial equipment and structures. Subcontractors typically require specialised certification and equipment to bid this scope. It is common in tank cleaning, pipeline maintenance, and surface prep work.

Related Terms

Field Ticket

Industry

A document created in the field that records work performed, equipment used, materials consumed, and time spent. Field tickets are the basis for invoicing and must typically be approved by the customer before payment.

Directional Drilling

Industry

A drilling technique used to steer a wellbore along a non-vertical path to reach a target zone. Subcontractors supporting these operations often require specialised tooling, MWD (Measurement While Drilling) equipment, and certified directional hands. Scopes can shift quickly, so flexible crew and equipment mobilisation is essential.

PCP (Progressive Cavity Pump)

Industry

A rotary pump used in oil and gas production to lift heavy or viscous fluids from wellbores. Subcontractors are frequently hired for PCP installation, maintenance, and rod-string servicing. Familiarity with drive heads, stators, and rotors is essential for field technicians working these jobs.

Carbon Dioxide Treater

Industry

A vessel or system used on oil and gas sites to remove CO2 (Carbon Dioxide) from produced gas or water streams. Subcontractors are often hired to install, service, and inspect these units. Proper handling requires H2S and pressure safety training.

KPI (Key Performance Indicator)

Industry

A measurable target used to evaluate a subcontractor's performance on safety, productivity, or quality. Clients track KPIs to assess contract compliance and award future work. Common field KPIs include incident rates, on-time mobilisation, and equipment uptime.

Drilling Optimisation

Industry

The process of improving drilling speed, efficiency, and cost performance on a well. Subcontractors may be asked to adjust crew rotations, equipment deployment, or service timing to support optimisation targets. Faster drilling cycles can shorten contract durations, affecting your crew planning and invoicing schedules.

Stay sharp on field operations

Industry news and insights, delivered to your inbox.

Subscribe to FieldNews
A community project by Aimsio