
Siemens Energy Sees Gas Turbine Demand Holding Through 2035
Siemens Energy reports a 65 GW gas turbine backlog and says orders should continue at about the current pace through 2030, possibly 2035. Power-plant subcontractors should price long-lead equipment risk into 2027-2028 bids.
