FieldNews
Subscribe

Daily oil & gas and construction news for subcontractors

IndustryGlossary Term

Completions

The phase of oil and gas well development after drilling is finished, encompassing the work required to prepare a well for production — including perforating, fracturing, and installing wellhead equipment. For subcontractors, completions represent a concentrated burst of high-demand field work where specialised crews, equipment, and services are mobilised under tight timelines.

Related Terms

FFS (Fitness-for-service)

Industry

A structured engineering assessment that determines whether ageing or damaged equipment is safe to keep operating. Subcontractors are often hired to collect inspection data, run integrity tests, or execute repairs recommended by FFS evaluations. Understanding FFS scope helps field crews prioritise work orders and meet client fitness thresholds before returning assets to service.

VLCC (Very Large Crude Carrier)

Industry

A massive oil tanker capable of carrying up to two million barrels of crude. Subcontractors providing marine maintenance, inspection, or coating services may be mobilised to service VLCCs at port or in dry dock. These vessels require specialised certifications and safety compliance for anyone working aboard.

Production Shut-in

Industry

A temporary halt to oil or gas production at a well or facility, ordered by the operator. For subcontractors, this often means suspended work orders and delayed revenue until operations resume. Standby rates and demobilisation terms in your contract become critical during a shut-in.

Lease Sale

Industry

A government auction where energy companies bid for the right to explore and develop specific land or offshore blocks. Winning bids signal upcoming exploration activity, which often leads to new work opportunities for field service subcontractors. Tracking lease sales helps companies anticipate demand and position crews and equipment accordingly.

500-Kv Transmission Line

Industry

A high-voltage power line carrying 500 kilovolts, typically built to move bulk electricity across long distances. Subcontractors on these projects must hold specialised high-voltage certifications and follow strict safety exclusion zones. Work scopes often include tower erection, conductor stringing, and ground grid installation.

Shallow-Water

Industry

Offshore operating zones typically under 500 feet of water depth. For subcontractors, these sites use jack-up rigs and barges rather than deepwater vessels. Crew access, equipment requirements, and mobilisation costs differ significantly from deepwater scopes.

Stay sharp on field operations

Industry news and insights, delivered to your inbox.

Subscribe to FieldNews
A community project byAimsio