Pressure-Retaining Component

Any part that contains or holds pressurised fluid, such as a valve, fitting, or vessel wall. Subcontractors handling these parts must meet strict inspection and certification requirements. Improper installation or repair can trigger liability, stop-work orders, or regulatory penalties.

Related Terms

Near Miss

Compliance

An unplanned event that did not result in injury or damage but had the potential to do so. Subcontractors are typically required to report near misses to the prime contractor or site owner. Failing to report can jeopardise your safety record and standing on site.

Personal Fall Arrest System

Compliance

A PFAS (Personal Fall Arrest System) is safety equipment that stops a worker from hitting the ground during a fall. It typically includes a full-body harness, lanyard, and anchor point. Subcontractors must ensure PFAS equipment is inspected, certified, and meets provincial and federal regulations before workers go at height.

LSL (Lead Service Line)

Compliance

A water pipe made from lead that connects a municipal main to a building. Subcontractors must identify and report LSLs during excavation, pipe work, or utility upgrades. Strict handling and disposal regulations apply under federal and provincial environmental codes.

CBP (Customs and Border Protection)

Compliance

The U.S. federal agency that regulates the entry of workers, equipment, and materials across the Canadian-American border, which subcontractors must navigate when mobilising crews or hauling specialised equipment into U.S. job sites. Non-compliance with CBP requirements can result in delays at the border, seized equipment, or crews being turned away, making proper documentation and advance planning critical for cross-border field work.

Jones Act

Compliance

A U.S. federal law requiring vessels operating between American ports to be U.S.-built, owned, and crewed. Subcontractors providing marine labour or vessel services must verify crew eligibility and vessel compliance before mobilising. Non-compliance can result in contract termination and significant fines.

CMAA (Crane Manufacturers Association of America)

Compliance

Industry body that sets design and performance standards for overhead cranes and hoists. Subcontractors must confirm equipment meets CMAA specifications before mobilising on regulated job sites. Non-compliant cranes can trigger site rejection or compliance holds.