Industry body that sets design and performance standards for overhead cranes and hoists. Subcontractors must confirm equipment meets CMAA specifications before mobilising on regulated job sites. Non-compliant cranes can trigger site rejection or compliance holds.
CMAA (Crane Manufacturers Association of America)
Related Terms
Third-Party Locator
ComplianceAn independent company hired to identify and mark underground utilities before excavation or drilling begins. Subcontractors often rely on third-party locators when the site owner's in-house locate services are unavailable. Their clearance report is typically required before ground disturbance can proceed.
Burn Ban
ComplianceA government-issued restriction prohibiting open burning, including burn barrels and brush fires, within a designated area. Subcontractors must halt any permitted burning activities immediately and may face project delays. Check with your site supervisor and local authority before resuming work involving open flame or debris disposal.
Nfpa 70e (national Fire Protection Association 70e Standard for Electrical Safety in the Workplace)
ComplianceA U.S. standard governing electrical safety practices, PPE requirements, and arc flash hazard protocols on job sites. Subcontractors working on energised electrical systems must comply to meet site access and insurance requirements. Canadian contractors often encounter it on cross-border projects or with American general contractors.
NDE (Non-destructive Examination)
ComplianceTesting method used to inspect welds, pipes, and structures for defects without damaging the material. Subcontractors performing NDE must hold recognised certifications such as CGSB or ASNT. Clients often require NDE sign-off before authorising progress payments or work acceptance.
Foreign-Flagged Vessel
ComplianceA marine vessel registered under another country's flag rather than the nation where it operates. Subcontractors must verify compliance with cabotage laws, as restrictions may limit which vessels can legally perform local work. This affects equipment mobilisation planning and contract eligibility on offshore projects.
Federal Impact Assessment
ComplianceA government review process evaluating environmental and social effects of major projects under the Impact Assessment Act. Subcontractors may face delayed mobilisation or scope changes while projects await federal approval. Understanding timelines helps field crews plan resources and avoid costly standby situations.
Latest Compliance News
Confined Space Safety: Why Gas Detection Upkeep Can't Be Skipped
Safety+Health Magazine outlines confined space gas detection best practices, stressing daily bump tests, calibration gas checks, and paired personal-fixed monitoring systems.
21 hours ago ComplianceOSHA's 2026 Agenda Targets Lockout/Tagout, Heat Rule, Power Presses
OSHA's newly released regulatory agenda sets a November target for a modernized lockout/tagout proposal and a December supplemental notice on the heat rule, while MSHA plans a revised silica proposal for July.
21 hours ago ComplianceWhat ABC's STEP Safety Data Means for Subs Bidding Against Uncertified Rivals
A new ABC report shows STEP-certified contractors post incident rates 686% better than the industry average, a gap that increasingly shows up in EMR calculations, insurance pricing and GC prequalification scoring.
21 hours ago ComplianceJobsite Waste Compliance: Why Cutting Corners on Debris Removal Costs More Later
Construction Executive breaks down how jobsite waste-handling missteps can trigger fines, shutdowns and reputational damage, and why picking a disposal vendor on price alone is a bidding mistake for contractors.
yesterdayRelated Guides
When a Jobsite Incident Happens: What Field Workers Need to Know Before Signing Anything
What to do after a jobsite injury or incident, what your rights are before signing incident reports, how workers' compensation works, and how to protect yourself on multi-employer worksites.
Compliance GuideOSHA Citations on Multi-Employer Worksites: What Subcontractors Need to Know
Learn how OSHA's multi-employer citation policy works, why subcontractors get cited for hazards they didn't create, and how to protect your company on operator-controlled job sites.
Compliance GuideHow to Read and Negotiate an Oilfield Master Service Agreement (MSA): A Subcontractor's Guide
Learn which MSA clauses actually matter for oilfield subcontractors: indemnity, insurance, payment terms, and change orders. Know what you're signing.
Stay sharp on field operations
Industry news and insights, delivered to your inbox.
Subscribe to FieldNews