FieldNews
Subscribe

Daily oil & gas and construction news for subcontractors

IndustryGlossary Term

Megafab

A large-scale modular fabrication project where major facility components are built offsite and shipped for final assembly. For subcontractors, megafabs mean long-duration scopes, high crew volumes, and complex multi-trade coordination. Scheduling and mobilisation demands are typically intense.

Related Terms

FLNG (Floating Lng Unit)

Industry

An offshore vessel that processes, liquefies, and stores natural gas at sea without a fixed onshore plant. Subcontractors work aboard these units for commissioning, maintenance, and inspection scopes. Access is offshore, so mob costs, safety certifications, and logistics are major bid considerations.

Frac Sand Hauling

Industry

The trucking of proppant (silica sand) from storage terminals to active frac sites. Subcontractors operate on tight dispatch schedules to maintain continuous sand supply during pumping operations. Contracts often include standby rates for wait time at the wellsite.

NPRA (National Petroleum Reserve-alaska)

Industry

A large federally managed area in northwest Alaska open to oil and gas exploration and development. Subcontractors working here face extreme remote logistics, strict federal permitting, and seasonal access windows. Mobilisation costs and compliance requirements are significantly higher than conventional onshore projects.

Ultra-Deepwater

Industry

Offshore drilling operations conducted in water depths exceeding 1,500 metres. Subcontractors working these projects require specialised certifications, equipment ratings, and offshore survival training. Mobilisation costs and logistics complexity are significantly higher than shallow-water scopes.

Suspension Order

Industry

A formal directive from a prime contractor or operator to halt work on a project temporarily. Subcontractors must stop billable activities but may still incur standby costs. Review your contract carefully, as suspension terms affect demobilisation, remobilisation, and delay compensation.

Secondary Stress

Industry

Indirect mechanical stress that develops in structures or piping due to thermal expansion, settlement, or equipment movement. Unlike primary stress, it isn't caused by direct applied loads. Subcontractors must account for it during installation and inspection to avoid material fatigue and warranty disputes.

Stay sharp on field operations

Industry news and insights, delivered to your inbox.

Subscribe to FieldNews
A community project byAimsio