FieldNews
Subscribe

Daily oil & gas and construction news for subcontractors

IndustryGlossary Term

Battery Storage

Systems that store electrical energy on-site for use during peak demand or grid outages. Subcontractors increasingly deploy these on remote job sites to reduce generator fuel costs. They also support electrified equipment fleets and temporary power setups.

Related Terms

Lateral Length

Industry

The horizontal distance drilled from the kickoff point to the end of a wellbore, typically measured in metres. Longer laterals mean more stages, more equipment, and extended crew time on location. Subcontractors should factor lateral length into job costing and resource planning.

Conduit Installation

Industry

The process of routing and securing protective tubing or piping to house electrical wiring on job sites. Subcontractors are typically scoped for this work during facility builds, plant turnarounds, or infrastructure upgrades. Accurate material take-offs and labour estimates are critical to pricing this work profitably.

Project Delivery Method

Industry

The contractual framework that determines how an owner, general contractor, and subcontractors are organised on a project. It directly affects when you get hired, who you report to, and how your scope is defined. Common methods include DBB (Design-Bid-Build), DB (Design-Build), and EPCM (Engineering, Procurement, and Construction Management).

VRU (Vapour Recovery Unit)

Industry

A compression system that captures hydrocarbon vapours from storage tanks or production equipment instead of venting them. Subcontractors are often hired to install, maintain, or service VRUs to meet emissions regulations. Familiarity with VRU work is increasingly required on oil and gas production sites.

Lower 48

Industry

Refers to the contiguous United States, excluding Alaska and Hawaii. For subcontractors, it defines a common work jurisdiction with distinct regulatory, tax, and labour rules from Canadian or Alaskan operations. Mobilisation costs and compliance requirements differ significantly when crews cross into or out of this region.

PAUT (Phased Array Ultrasonic Testing)

Industry

An advanced non-destructive testing method that uses multiple ultrasonic beams to inspect welds, pipelines, and structural components for defects. It produces detailed cross-sectional images without cutting or damaging the material. Subcontractors offering PAUT services typically require certified Level II or III technicians and specialised portable equipment.

Stay sharp on field operations

Industry news and insights, delivered to your inbox.

Subscribe to FieldNews
A community project byAimsio