FieldNews
Subscribe

Daily oil & gas and construction news for subcontractors

ComplianceGlossary Term

Sloping (excavation)

A trench safety method where excavation walls are cut at a gradual angle to prevent collapse. Subcontractors must apply correct slope ratios based on soil type and provincial regulations. Non-compliance can halt work and trigger serious liability.

Related Terms

MVR (Motor Vehicle Record)

Compliance

An official document showing a driver's licence history, violations, and suspensions. Clients and prime contractors often require MVRs before allowing subcontractor personnel to operate vehicles on site. A clean MVR is frequently a condition of insurance coverage and site access approval.

NAVFAC (Naval Facilities Engineering Systems Command)

Compliance

The U.S. Navy agency that manages construction, facilities, and infrastructure contracts on military installations. Subcontractors working NAVFAC projects must meet strict security, compliance, and documentation requirements. Expect rigorous vetting, access protocols, and federally mandated labour standards on all NAVFAC job sites.

Nuclear Verdict

Compliance

A jury award so large it far exceeds actual damages, often driven by juror emotion rather than evidence. For subcontractors, even one such ruling can bankrupt a company or trigger uninsurable liability exposure. These verdicts are increasingly common in oilfield and construction injury cases.

Serious Citation

Compliance

A regulatory violation notice issued when an inspector finds a condition likely to cause serious injury or death. For subcontractors, it typically triggers fines, mandatory corrective action, and potential work stoppage. These citations can affect prequalification standing and future contract eligibility.

Zero-Tolerance (drug and Alcohol Policy)

Compliance

A site policy that prohibits any detectable level of drugs or alcohol in workers. Subcontractors must ensure all personnel pass pre-access and random testing. Violations typically result in immediate removal from site and contract penalties.

Pressure-Retaining Component

Compliance

Any part that contains or holds pressurised fluid, such as a valve, fitting, or vessel wall. Subcontractors handling these parts must meet strict inspection and certification requirements. Improper installation or repair can trigger liability, stop-work orders, or regulatory penalties.

Stay sharp on field operations

Industry news and insights, delivered to your inbox.

Subscribe to FieldNews
A community project byAimsio