FieldNews
Subscribe

Daily oil & gas and construction news for subcontractors

ComplianceGlossary Term

Recordable Injury

A work-related injury or illness that requires more than basic first aid, such as medical treatment, restricted duty, or lost time. Subcontractors must log these incidents and report them to the prime contractor. High recordable rates can disqualify your company from future bids or vendor pre-qualification lists.

Related Terms

Hazard Elimination

Compliance

The highest level of hazard control, where a risk is completely removed from the worksite rather than managed. For subcontractors, this may mean redesigning a task or substituting dangerous equipment before mobilising crews. It is the preferred first step in any hierarchy of controls review.

Exclusion Zone

Compliance

A clearly marked area on a worksite where only authorised personnel are permitted to enter. Subcontractors must identify and respect these boundaries before mobilising crews or equipment. Violations can result in stop-work orders, fines, or removal from site.

PIT (Powered Industrial Truck)

Compliance

Any motorised vehicle used to move materials on a worksite, including forklifts, reach trucks, and pallet jacks. Subcontractors operating PITs must ensure operators hold valid, site-accepted certifications. Non-compliance can trigger work stoppages or removal from site.

FTA (Federal Transit Administration)

Compliance

A U.S. federal agency that funds and regulates public transit infrastructure projects. Subcontractors working on federally funded transit construction must meet strict FTA compliance requirements. These include labour standards, safety protocols, and Buy America provisions for materials.

Surety

Compliance

A third party, usually an insurance or bonding company, that guarantees a subcontractor will fulfil their contractual obligations. If the subcontractor defaults, the surety compensates the project owner. Many upstream and construction clients require surety bonds before awarding work.

Locate Ticket

Compliance

An official work request issued before any ground disturbance, requiring underground utilities to be marked out. Subcontractors must have an active locate ticket on site before excavation begins. Working without one can result in fines, liability, or contract termination.

Stay sharp on field operations

Industry news and insights, delivered to your inbox.

Subscribe to FieldNews
A community project byAimsio