FTA (Federal Transit Administration)

A U.S. federal agency that funds and regulates public transit infrastructure projects. Subcontractors working on federally funded transit construction must meet strict FTA compliance requirements. These include labour standards, safety protocols, and Buy America provisions for materials.

Related Terms

Osha (occupational Safety and Health Administration) Variance

Compliance

A formal permit allowing a subcontractor to use an alternative method that differs from a standard OSHA regulation. It is granted when the alternative provides equal or greater worker protection. Subcontractors must apply directly and remain compliant with all variance conditions during field operations.

BOEM (Bureau of Ocean Energy Management)

Compliance

The U.S. federal agency overseeing offshore energy leasing on the Outer Continental Shelf. Subcontractors working U.S. offshore projects must meet BOEM-driven compliance requirements set by their prime contractors. Permits and operational approvals from BOEM directly affect project timelines and mobilisation schedules.

JHA (Job Hazard Analysis)

Compliance

A written document identifying hazards and controls for a specific task before work begins. Subcontractors are typically required to complete and submit JHAs to the prime contractor or site owner. Failure to have a compliant JHA on site can result in work stoppages or disqualification from bidding.

Api 579-1/asme Ffs-1 (fitness-for-Service Standard)

Compliance

A joint API/ASME standard used to assess whether ageing or damaged equipment is still safe to operate. Subcontractors may be required to conduct or support FFS assessments on pressure vessels, piping, and tanks. Results determine if equipment can stay in service, requires repair, or must be decommissioned.

EVI (External Visual Inspection)

Compliance

A documented check of equipment or structures for visible damage, corrosion, or defects — completed without disassembly. Subcontractors are often required to perform or witness EVIs before mobilising equipment on site. Results are typically recorded on inspection forms tied to client or regulatory compliance packages.

Federal Acreage

Compliance

Land or mineral rights owned and managed by the federal government where drilling or construction activity requires federal permits and approvals. Subcontractors working on federal acreage must meet stricter regulatory requirements than on provincial or private land. Expect longer permitting timelines and additional compliance obligations that can affect project schedules and mobilisation.