FTA (Federal Transit Administration)

A U.S. federal agency that funds and regulates public transit infrastructure projects. Subcontractors working on federally funded transit construction must meet strict FTA compliance requirements. These include labour standards, safety protocols, and Buy America provisions for materials.

Related Terms

Vehicle Incursion

Compliance

An unauthorised entry of a vehicle into a restricted or controlled work zone on a job site. Subcontractors are often held liable if their equipment or drivers breach designated exclusion areas. Incursions can trigger incident reports, work stoppages, and contract penalties.

Carbon Pricing

Compliance

A government-imposed cost on greenhouse gas emissions, typically applied per tonne of CO2 equivalent. Subcontractors may face carbon charges on fuel, equipment operation, and fleet usage. These costs can affect project bids and operating margins if not factored into quotes.

MSHA (Mine Safety and Health Administration)

Compliance

A U.S. federal agency that regulates safety at mines and quarries. Subcontractors working on mine sites must comply with MSHA standards, separate from OSHA rules. Workers may require site-specific MSHA training before mobilising.

Agreed Order

Compliance

A court-approved settlement between parties that resolves a dispute without a full trial. For subcontractors, it often governs payment terms, lien releases, or compliance obligations. Both sides must follow its terms or face legal consequences.

Dig-In

Compliance

An accidental strike on a buried utility, pipeline, or cable during excavation work. For subcontractors, a dig-in can trigger work stoppages, liability claims, and regulatory investigations. Always confirm locate tickets are current before any ground disturbance.

Designer of Record

Compliance

The licensed engineer or firm legally responsible for a project's design documents and specifications. Subcontractors must follow their approved drawings exactly — any field changes require written authorisation from the Designer of Record. Deviating without approval can void liability protection and trigger compliance issues.