FieldNews
Subscribe

Daily oil & gas and construction news for subcontractors

IndustryGlossary Term

OSHA

Related Terms

Call for Participation

Industry

A formal notice from an operator or prime contractor inviting subcontractors to express interest in an upcoming project or contract. It typically outlines scope, required certifications, and submission deadlines. Responding early can improve your chances of being shortlisted for the work.

Lower-Tier Subcontractor

Industry

A company or sole operator hired by a subcontractor, rather than directly by the prime contractor or owner. Lower-tier subs often face delayed payment cycles and reduced contract visibility. Understanding your tier position affects lien rights, insurance requirements, and invoice routing.

Directional Services

Industry

Specialised drilling support that steers a wellbore along a planned trajectory rather than straight down. Subcontractors provide MWD (Measurement While Drilling) tools, mud motors, and on-site directional drillers. These crews are typically mobilised on a per-well basis under dedicated service contracts.

Roadway Decking

Industry

Temporary modular panels laid over pipelines, cables, or trenches to allow vehicle and equipment traffic across a work site. Subcontractors are often responsible for installation, load-rating compliance, and removal. Costs are typically billable as a mobilisation or site-prep line item.

Reactivation

Industry

The process of bringing a dormant well, pipeline, or piece of equipment back into active service, often requiring subcontractors to mobilise crews, conduct inspections, and complete compliance checks before full operations can resume. For field service companies, reactivation work can represent a significant surge in contract opportunities, particularly during periods of rising commodity prices.

Lateral Length

Industry

The horizontal distance drilled from the kickoff point to the end of a wellbore, typically measured in metres. Longer laterals mean more stages, more equipment, and extended crew time on location. Subcontractors should factor lateral length into job costing and resource planning.

Stay sharp on field operations

Industry news and insights, delivered to your inbox.

Subscribe to FieldNews
A community project byAimsio