FieldNews
Subscribe

Daily oil & gas and construction news for subcontractors

IndustryGlossary Term

Opec+ (organisation of the Petroleum Exporting Countries Plus)

An alliance of oil-producing nations that controls global crude output levels. Their production decisions directly affect upstream activity and subcontractor demand. When OPEC+ cuts output, drilling and field service work typically slows; increases often trigger new project mobilisations.

Related Terms

Triple Drilling Rig

Industry

A large land rig capable of drilling deep wells, typically over 5,000 metres. It requires specialised subcontractors and larger crews than smaller single or double rigs. Expect higher equipment and certification requirements when bidding on triple rig projects.

Letter of Interest

Industry

A formal document a subcontractor submits to a prime contractor or operator to express intent to bid on upcoming work. It is not a binding commitment, but helps secure a spot in the tender process. Common in pre-qualification stages for large oilfield or construction scopes.

Lateral Length

Industry

The horizontal distance drilled from the kickoff point to the end of a wellbore, typically measured in metres. Longer laterals mean more stages, more equipment, and extended crew time on location. Subcontractors should factor lateral length into job costing and resource planning.

Aggregates

Industry

Crushed stone, gravel, and sand used as base materials in construction and oil and gas site preparation. Subcontractors sourcing or hauling aggregates must account for material costs, transport, and site access conditions. Pricing and availability vary significantly by region and project remoteness.

MCF (Thousand Cubic Feet)

Industry

Standard unit for measuring natural gas volumes, equal to 1,000 cubic feet. Subcontractors use MCF to interpret production targets, scope work, and align service pricing on gas well projects. Billing rates and throughput bonuses are often tied directly to MCF volumes.

Legacy Well

Industry

An older well built to outdated standards that may require specialised remediation, abandonment, or workover services. Subcontractors should expect non-standard equipment configurations and additional compliance requirements. Scope creep and unforeseen costs are common on legacy well projects.

Stay sharp on field operations

Industry news and insights, delivered to your inbox.

Subscribe to FieldNews
A community project byAimsio