A formal document a subcontractor submits to a prime contractor or operator to express intent to bid on upcoming work. It is not a binding commitment, but helps secure a spot in the tender process. Common in pre-qualification stages for large oilfield or construction scopes.
Letter of Interest
Related Terms
Hydrocyclone
IndustryA cone-shaped separation device that removes solids or liquids from drilling fluids using centrifugal force. Subcontractors service and maintain these units on drilling rigs and fluid processing systems. Proper handling requires familiarity with high-pressure fluid systems and waste disposal regulations.
BOEPD (Barrels of Oil Equivalent Per Day)
IndustryA standardised measure combining oil, gas, and NGL output into a single daily production figure. Operators use it to size contracts and scope field service requirements. Higher BOEPD targets typically mean more crews, equipment, and sustained subcontractor workload.
Feasibility Study
IndustryA pre-project assessment that evaluates whether a scope of work is technically and financially viable. For subcontractors, it signals early-stage work that may lead to awarded contracts. Participating in feasibility work can position your company for the larger project bid.
Ip30 (initial Production 30-Day Rate)
IndustryA well's average daily output during its first 30 days of production. Operators use IP30 figures to evaluate well performance and plan follow-on service scopes. Strong IP30 results often drive faster mobilisation of additional field crews and equipment.
Leasehold
IndustryLand or mineral rights an operator has legally secured through a lease agreement with the landowner or Crown. Subcontractors typically work within leasehold boundaries, so access, permitting, and site rules are set by the operator holding the lease. Understanding leasehold limits helps crews avoid trespassing on adjacent unlicensed areas.
Shut-In Production
IndustryA well or facility that has been temporarily halted from producing oil or gas. For subcontractors, shut-ins often mean suspended work orders and delayed invoicing. Confirm contract terms around standby rates before production stops.
Latest Industry News
Uniper Signs Preliminary LNG Offtake Deal for BC's Ksi Lisims Project
German energy company Uniper has signed a letter of interest for 2 million tonnes per year of LNG from British Columbia's Ksi Lisims export facility, adding commercial momentum to a project that could begin construction by 2027.
1 month agoIndustryAecon-Led Group With First Nations Partners Signs Deal for Ontario BESS Project
Aecon Concessions and four First Nations and energy partners have signed a 20-year storage agreement with Ontario's IESO to build a 150 MW/1,200 MWh battery project in Norfolk County, targeting 2030 commercial operations.
20 hours agoIndustryAthabasca Spends $55M on Corner SAGD Prep, Holds Off Final Sanction
Athabasca Oil Corp is putting $55 million into site prep and engineering for Corner Phase 1 SAGD but has not yet issued a formal sanction, Oil Sands Magazine reports, as it awaits clarity on Alberta's fiscal framework.
20 hours agoIndustryBoston Secures 65% Federal Match for $10B Flood Defense Plan
The U.S. Army Corps has approved cost-share terms for Boston's coastal resilience program, clearing the way for more than 20 flood-protection projects that civil, marine, and utility contractors should begin tracking now.
20 hours agoRelated Guides
How Operator Mergers and Acquisitions Affect Your Subcontract Agreements
When operators merge, get acquired, or sell assets, subcontractor agreements are caught in the middle. Learn how M&A activity affects your MSA, payment terms, vendor status, and what to do before, during, and after a deal closes.
Industry GuideHow Rig Count Trends Affect Subcontractor Demand and What to Do About It
Rig counts are the earliest signal of where field service work is heading. Learn how to read drilling activity trends, anticipate demand shifts, and position your crew before the phone stops ringing.
Industry GuideWhat Is an AFE in Oil and Gas and How Does It Affect Subcontractor Payments?
An AFE (Authorization for Expenditure) controls every dollar spent on an oilfield project. Learn how it affects your billing, change orders, and cash flow as a subcontractor.
Stay sharp on field operations
Industry news and insights, delivered to your inbox.
Subscribe to FieldNews