A facility that measures the volume or flow rate of oil, gas, or water moving through a pipeline. Subcontractors are often mobilised to install, calibrate, inspect, or maintain metering equipment at these sites. Work scope can include instrumentation, piping, civil, and electrical trades.
Meter Station
Related Terms
2c Resources
IndustryThe middle estimate of contingent petroleum resources that are discovered but not yet approved for development. For subcontractors, 2C resource announcements often signal future project opportunities that are not yet fully funded. Bid opportunities tied to 2C resources carry higher uncertainty and may shift significantly before contracts are awarded.
Proactive Maintenance
IndustryScheduled inspections and repairs performed before equipment fails, reducing costly downtime on job sites. Subcontractors who offer proactive maintenance services can secure longer-term service agreements with operators. It also helps avoid liability tied to unexpected breakdowns during active contracts.
Turnaround
IndustryA planned shutdown of a facility for maintenance, inspection, and repair. Turnarounds often require large numbers of contractors and subcontractors working intensive schedules.
Run Schedule
IndustryA timeline that outlines when specific tools, equipment, or crews are deployed downhole or on-site during an operation, dictating when a subcontractor's services are required and for how long. For field service companies, the run schedule directly determines mobilisation timing, crew rotations, and invoiceable hours on location.
Spud Date
IndustryThe date when drilling begins on a new well. Marks the start of drilling operations.
Integrity Testing
IndustryPressure or leak testing performed on pipelines, vessels, or equipment to confirm structural soundness before operations begin. Subcontractors are often scoped specifically for this work as a standalone service. Clients may require certified personnel and documented results before approving system start-up.
Latest Industry News
Jacobs-PCL Wins $1B SF Plant Upgrade Built Around Live Operations
SFPUC picked a Jacobs-PCL joint venture for a $1 billion progressive design-build nutrient reduction project at its largest treatment plant. The plant must keep running during construction, which shapes how subs should pursue early involvement.
11 hours agoIndustryAEP Lifts Capital Plan 30% to $100B as Data Center Load Hits 84 GW
AEP raised its five-year capital plan to $100 billion, with $37 billion for transmission and $20 billion for gas generation. A 10.4-GW Ohio data center campus drives the load growth, and three 765-kV lines are slated for 2028 through 2030.
yesterdayIndustryTranche-Scale Transmission Planning: Early Contractor Input Wins
A T&D World webinar summary says utilities should bring contractors in when engineering is 10% to 30% complete and treat site access as engineering. Here is what that means for crews and yard commitments.
yesterdayIndustryConditional $5B DOE Loan Targets Eight Constellation Nuclear Plants
DOE has conditionally committed up to $5 billion to finance about 1.1 GW of uprates at eight Constellation plants in Illinois, Maryland and Pennsylvania. The loan is not closed, but the scope points to turbine, electrical and controls work.
2 days agoRelated Guides
How Operator Mergers and Acquisitions Affect Your Subcontract Agreements
When operators merge, get acquired, or sell assets, subcontractor agreements are caught in the middle. Learn how M&A activity affects your MSA, payment terms, vendor status, and what to do before, during, and after a deal closes.
Industry GuideHow Rig Count Trends Affect Subcontractor Demand and What to Do About It
Rig counts are the earliest signal of where field service work is heading. Learn how to read drilling activity trends, anticipate demand shifts, and position your crew before the phone stops ringing.
Industry GuideWhat Is an AFE in Oil and Gas and How Does It Affect Subcontractor Payments?
An AFE (Authorization for Expenditure) controls every dollar spent on an oilfield project. Learn how it affects your billing, change orders, and cash flow as a subcontractor.