FieldNews
Subscribe

Daily oil & gas and construction news for subcontractors

ComplianceGlossary Term

Loading Away From the Face

A blasting technique where explosives are loaded starting from the back of the borehole toward the opening. This reduces the risk of premature detonation during charging operations. Subcontractors must follow site-specific protocols, as improper loading sequences can trigger serious safety violations.

Related Terms

Orphaned Well

Compliance

A well whose owner has abandoned it without completing proper decommissioning or reclamation. Regulators may hire subcontractors to remediate these sites under government-funded closure programmes. Verify liability terms carefully before mobilising, as responsibility chains can be unclear.

Engineering Hold Point

Compliance

A mandatory pause in field work where an engineer or inspector must review and approve progress before crews can continue. Subcontractors cannot proceed past this point without documented sign-off. Failing to stop can void warranties, trigger contract penalties, or cause costly rework.

Federal Highway Authorization

Compliance

A federal permit required to move oversized or overweight loads on public highways. Subcontractors hauling heavy equipment or modular components must obtain this before mobilising. Non-compliance can result in fines, delays, and project shutdowns.

Well Licensing

Compliance

A regulatory approval issued by provincial authorities before drilling or completing a well can begin. Subcontractors should confirm a valid licence is in place before mobilising, as work cannot legally proceed without it. Delays in licensing directly affect your crew scheduling and contract start dates.

Facility Permit

Compliance

A site-specific authorisation required before subcontractors can perform work at an owner-operated facility. It outlines approved work scopes, safety conditions, and access restrictions. Failing to secure one before mobilising can result in removal from site or contract penalties.

Designer of Record

Compliance

The licensed engineer or firm legally responsible for a project's design documents and specifications. Subcontractors must follow their approved drawings exactly — any field changes require written authorisation from the Designer of Record. Deviating without approval can void liability protection and trigger compliance issues.

Stay sharp on field operations

Industry news and insights, delivered to your inbox.

Subscribe to FieldNews
A community project byAimsio