FieldNews
Subscribe

Daily oil & gas and construction news for subcontractors

IndustryGlossary Term

Development Sanction

The formal approval by an operator or project owner to proceed with full-scale field development. For subcontractors, it signals that major contracts, mobilisation, and field work are imminent. It marks the point where scopes of work move from planning to active procurement.

Related Terms

Highway Trust Fund

Industry

A U.S. federal fund that finances highway and infrastructure construction projects. Subcontractors bidding on federally funded road or infrastructure work must meet strict compliance and wage requirements tied to this funding. Budget cycles and congressional approvals directly affect project timelines and payment schedules.

Offtake Agreement

Industry

A long-term contract where a buyer commits to purchasing a set volume of product from a producer. For subcontractors, these agreements signal stable, ongoing site activity and sustained demand for field services. They often underpin project financing, making worksites more financially secure for service providers.

Frac Sand Hauling

Industry

The trucking of proppant (silica sand) from storage terminals to active frac sites. Subcontractors operate on tight dispatch schedules to maintain continuous sand supply during pumping operations. Contracts often include standby rates for wait time at the wellsite.

Crane Mats

Industry

Large interlocked timber or composite panels placed under crane outriggers to distribute load on soft or unstable ground. Subcontractors often supply, transport, and install them as part of site prep scopes. Rental and mobilisation costs should be clearly itemised in your quote.

Trenching Bucket

Industry

A narrow, deep excavator attachment used to dig trenches for pipelines, conduit, or utilities. Subcontractors specify bucket width based on pipe diameter and burial depth requirements. Having the correct size on-site avoids costly equipment swaps and project delays.

Substrate

Industry

The base material or surface that a coating, lining, or treatment is applied to, such as steel pipe, concrete, or wood. Subcontractors must assess substrate condition before starting surface prep or application work. Poor substrate quality can affect adhesion, warranty, and job acceptance.

Stay sharp on field operations

Industry news and insights, delivered to your inbox.

Subscribe to FieldNews
A community project byAimsio