Corrective Maintenance

Repair work performed after equipment has already failed or broken down. For subcontractors, it often means urgent mobilisation and unplanned labour costs. Scope can expand quickly, so clear change-order procedures are essential.

Related Terms

Long-Cycle

Industry

Refers to large capital projects with lead times and development phases spanning several years. For subcontractors, long-cycle work offers extended contract visibility but requires patience on mobilisation and payment timelines. Budget cycles and scope changes are common over the project life.

Mainline Pipe

Industry

The primary, large-diameter pipe forming the backbone of a transmission or distribution pipeline system. Subcontractors are typically hired for mainline installation, coating, welding, or hydrotesting scopes. Work on mainline pipe often carries strict inspection and quality requirements.

Hydraulic Structures

Industry

Built infrastructure that controls or directs water flow, such as dams, weirs, cofferdams, and retention ponds. Subcontractors working near these structures often face strict safety and permitting requirements. Scopes may include installation, inspection, maintenance, or dewatering support.

Transmission Main

Industry

A large-diameter pipeline that moves water, gas, or other fluids over long distances at high pressure. Subcontractors are often hired for installation, inspection, or maintenance work on these lines. Strict pressure ratings and material specs govern all field work.

Kelly Bar

Industry

A heavy, telescoping steel rod that transmits rotary torque from a drill rig to the auger or cutting tool. Subcontractors operating foundation or piling rigs must inspect kelly bars regularly for wear and cracking. Damage affects drilling performance and can cause costly downtime on tight project schedules.

Below-Grade

Industry

Any work or structure located below the finished ground surface, such as buried pipelines, foundations, or conduits. Subcontractors must account for added costs like shoring, dewatering, and confined space compliance. Scope changes below-grade often trigger change orders due to unforeseen soil or utility conditions.

Stay sharp on field operations

Industry news and insights, delivered to your inbox.

Subscribe to FieldNews
A community project byAimsio