FieldNews
Subscribe
Industry Glossary Term

2d/3d Seismic Survey

A geophysical mapping operation that uses sound waves to image underground formations before drilling begins. Subcontractors are hired to deploy geophones, vibroseis trucks, or marine streamers across large survey grids. Work is often remote and time-sensitive, with crews mobilising quickly once permits are secured.

Related Terms

Re-Export (crude)

Industry

Crude oil imported into one country and then shipped out to another without being refined domestically. For subcontractors, re-export activity drives short-term terminal, marine, and logistics work. Contract volumes can spike quickly, so crews and equipment must be mobilisation-ready.

Subsea Architecture

Industry

The arrangement of underwater equipment — wellheads, flowlines, manifolds, and controls — that connects a seabed well to a surface facility. Subcontractors working in ROV operations, umbilical installation, or inspection services must understand this layout to execute scopes safely. Work packages are often structured around specific architecture components.

Battery Storage

Industry

Systems that store electrical energy on-site for use during peak demand or grid outages. Subcontractors increasingly deploy these on remote job sites to reduce generator fuel costs. They also support electrified equipment fleets and temporary power setups.

Microreactor

Industry

A compact, factory-built nuclear reactor designed to power remote industrial sites and off-grid operations. For subcontractors, these units may replace diesel gen-sets at isolated worksites. Expect new safety certification and compliance requirements when working near these systems.

Task Order

Industry

A formal document issued under a master contract that authorises a specific scope of work, timeline, and budget. Subcontractors use task orders to mobilise crews and bill for individual job phases. Each task order typically carries its own number for invoicing and cost-tracking purposes.

Integration Gap

Industry

The disconnect that occurs when a subcontractor's systems cannot communicate directly with a prime contractor's or operator's software platforms. This forces crews to manually re-enter data such as timesheets, work orders, or inspection records. The result is delays, billing errors, and compliance risks in the field.

Stay sharp on field operations

Industry news and insights, delivered to your inbox.

Subscribe to FieldNews
A community project by Aimsio