FieldNews
Subscribe

Daily oil & gas and construction news for subcontractors

Workforce2 min read

Untapped US Dams Could Add 15.2 TWh of Hydropower, Study Finds

A new Oak Ridge and Idaho National Laboratory study finds existing US dams could generate 15.2 terawatt-hours of additional power through retrofits, pointing to future licensing and construction work at non-powered dams.

FieldNews Staff|

Untapped US Dams Could Add 15.2 TWh of Hydropower, Study Finds

Oak Ridge National Laboratory and Idaho National Laboratory have identified 15.2 terawatt-hours of untapped hydropower potential at existing US dams, enough electricity to power more than 1.4 million homes, without building a single new dam, OilPrice.com reports. The findings come from a new modeling tool called HydroGenerate, which combines water flow data from the US Geological Survey and Oak Ridge to assess retrofit potential dam by dam, accounting for constraints like flood control and navigation requirements.

Only 3% of US dams currently generate power. Most of the dams flagged as suitable for retrofitting sit in the Great Lakes basin and the upper Mississippi River, and 86% are federal facilities, according to the report. Separately, the Department of Energyโ€™s Hydropower and Hydrokinetic Office awarded $5.5 million across 11 national laboratory projects last month to streamline licensing, with about 16 GW of existing hydropower capacity facing relicensing over the next decade, per the National Hydropower Association.

What It Means for Subcontractors

  • Heavy-civil, mechanical, and electrical subs should watch for retrofit and turbine installation packages emerging at non-powered federal dams, concentrated in the Great Lakes basin and upper Mississippi River region rather than traditional hydropower states like Washington or California.
  • Firms with hydropower licensing or environmental permitting experience can position now, since the DOEโ€™s $5.5 million licensing-speedup initiative and the 16 GW relicensing backlog signal a coming wave of compliance and engineering work at existing facilities.
  • Because 86% of identified retrofit-ready dams are federal facilities, subs should track federal procurement channels and Army Corps or Bureau of Reclamation contract vehicles rather than private utility RFPs for this pipeline.

Get The Field Report

The week in oil & gas and heavy construction โ€” market data, the big story, and where the work is. Every Sunday, in 60 seconds.

Free, no spam, unsubscribe anytime.

๐Ÿ“˜

Want the full picture?

From the Field to the Office: What Oilfield Workers Should Know Before Making the Switch

Thinking about moving from field work to an office role? This guide covers how your field experience translates into technical and operations positions, what the transition actually looks like, and the trade-offs most people do not talk about until it is too late.

Read the guide โ†’
Follow FieldNews
A community project byAimsio