A formal review process evaluating how a project affects Indigenous rights under specific treaties. Subcontractors may face work stoppages or scope changes if assessments flag concerns. Understanding active treaty areas helps crews anticipate permitting delays and access restrictions.
Treaty-Based Impact Assessment
Related Terms
FAR (Federal Acquisition Regulation)
ComplianceThe FAR governs purchasing rules for U.S. federal contracts, including subcontractor requirements on government-funded projects. If your prime contractor holds a federal contract, FAR clauses flow down and bind your work. These rules cover pricing, record-keeping, audits, and labour standards you must follow.
Carbon Intensity
ComplianceA measure of greenhouse gas emissions produced per unit of work or energy output. Operators increasingly require subcontractors to report and reduce carbon intensity on job sites. Lower scores can be a competitive advantage when bidding on contracts.
Surface Use Plan
ComplianceA document outlining how land above a wellsite or pipeline corridor can be accessed and used during operations. Subcontractors must follow it to avoid disturbing restricted areas or triggering landowner disputes. Non-compliance can result in work stoppages or liability on your crew.
General Duty Clause
ComplianceA provision in occupational health and safety legislation requiring employers to protect workers from recognised hazards, even when no specific regulation exists. For subcontractors, this means you can be cited for unsafe conditions on site regardless of client-controlled environments. It applies to your workers whether you own the worksite or not.
Locate Ticket
ComplianceAn official work request issued before any ground disturbance, requiring underground utilities to be marked out. Subcontractors must have an active locate ticket on site before excavation begins. Working without one can result in fines, liability, or contract termination.
Hold Point
ComplianceA mandatory stop in work where a client or inspector must review and sign off before the subcontractor can proceed. Missing a hold point can void certifications or trigger costly rework. Always confirm hold points during project kickoff to avoid schedule delays.
Latest Compliance News
Washington Eyes New Certification Rules for Forklifts Lifting Suspended Loads
Washington's L&I is drafting rule changes clarifying when forklift operators need crane-level certification for suspended loads, following a contractor petition over the state's August 2025 crane rule update.
yesterdayComplianceOSHA Fines Maine Pulp Mill $794K After Two Workers Die in Gas Release
ISHN reports OSHA hit Woodland Pulp LLC with nearly $800K in penalties after a hydrogen sulfide gas exposure killed two workers and a separate hydrogen peroxide fire followed weeks later at the Baileyville, Maine mill.
3 days agoComplianceFleetPride Hit With 16 Serious Violations After Confined Space Death
OSHA proposed $264,380 in penalties against FleetPride Inc. after a worker asphyxiated inspecting a tanker trailer, citing missing confined space and respiratory protection programs.
4 days agoComplianceTexas Governor Orders Data Center Audit, Freezing 474 GW Interconnection Queue
Gov. Greg Abbott has ordered an audit of all data centers in ERCOT's interconnection queue, prompting the grid operator to delay its Batch Zero review and stall large-load project timelines statewide.
4 days agoRelated Guides
When a Jobsite Incident Happens: What Field Workers Need to Know Before Signing Anything
What to do after a jobsite injury or incident, what your rights are before signing incident reports, how workers' compensation works, and how to protect yourself on multi-employer worksites.
Compliance GuideOSHA Citations on Multi-Employer Worksites: What Subcontractors Need to Know
Learn how OSHA's multi-employer citation policy works, why subcontractors get cited for hazards they didn't create, and how to protect your company on operator-controlled job sites.
Compliance GuideHow to Read and Negotiate an Oilfield Master Service Agreement (MSA): A Subcontractor's Guide
Learn which MSA clauses actually matter for oilfield subcontractors: indemnity, insurance, payment terms, and change orders. Know what you're signing.
Stay sharp on field operations
Industry news and insights, delivered to your inbox.
Subscribe to FieldNews