Tailgate Meeting

A brief, informal safety huddle held at the job site before work begins or when conditions change. Subcontractors use it to review hazards, assign tasks, and confirm crew readiness. It is often required by prime contractors and must be documented for compliance.

Related Terms

Non-Entry Rescue

Compliance

A rescue method for retrieving an incapacitated worker from a confined space without a rescuer entering it. Subcontractors must have approved non-entry rescue equipment and trained personnel on-site before any confined space work begins. Regulators in Canada require this as the primary rescue method wherever feasible.

Caught-In Hazard

Compliance

A workplace danger where a worker's body or clothing becomes trapped, pinched, or pulled into moving machinery, equipment, or materials — common on oilfield and construction sites where subcontractor crews work near rotating equipment, conveyor systems, or heavy moving loads. Subcontractors are responsible for identifying and controlling these hazards through proper guarding, lockout/tagout procedures, and site-specific hazard assessments before work begins.

Lockout/tagout

Compliance

A mandatory safety procedure requiring workers to isolate and de-energise equipment before servicing or maintenance begins. Subcontractors must follow the site owner's LOTO programme and hold current training documentation. Non-compliance can result in removal from site and contract termination.

Underground Utility Strike

Compliance

An accidental hit to a buried line — gas, electric, telecom, or water — during excavation or drilling. Subcontractors are typically liable for damages, work stoppages, and injuries if proper locates weren't completed. Always confirm valid BC One Call or Alberta One-Call tickets before breaking ground.

BOEM (Bureau of Ocean Energy Management)

Compliance

The U.S. federal agency overseeing offshore energy leasing on the Outer Continental Shelf. Subcontractors working U.S. offshore projects must meet BOEM-driven compliance requirements set by their prime contractors. Permits and operational approvals from BOEM directly affect project timelines and mobilisation schedules.

Management of Change

Compliance

A formal process for documenting and approving any deviation from original scope, equipment, or procedures on a worksite. Subcontractors must follow the prime contractor's MOC process before making field changes. Skipping this step can void your contract or expose your crew to liability.

Stay sharp on field operations

Industry news and insights, delivered to your inbox.

Subscribe to FieldNews
A community project byAimsio