A brief, informal safety huddle held at the job site before work begins or when conditions change. Subcontractors use it to review hazards, assign tasks, and confirm crew readiness. It is often required by prime contractors and must be documented for compliance.
Tailgate Meeting
Related Terms
Non-Entry Rescue
ComplianceA rescue method for retrieving an incapacitated worker from a confined space without a rescuer entering it. Subcontractors must have approved non-entry rescue equipment and trained personnel on-site before any confined space work begins. Regulators in Canada require this as the primary rescue method wherever feasible.
Caught-In Hazard
ComplianceA workplace danger where a worker's body or clothing becomes trapped, pinched, or pulled into moving machinery, equipment, or materials — common on oilfield and construction sites where subcontractor crews work near rotating equipment, conveyor systems, or heavy moving loads. Subcontractors are responsible for identifying and controlling these hazards through proper guarding, lockout/tagout procedures, and site-specific hazard assessments before work begins.
Lockout/tagout
ComplianceA mandatory safety procedure requiring workers to isolate and de-energise equipment before servicing or maintenance begins. Subcontractors must follow the site owner's LOTO programme and hold current training documentation. Non-compliance can result in removal from site and contract termination.
Underground Utility Strike
ComplianceAn accidental hit to a buried line — gas, electric, telecom, or water — during excavation or drilling. Subcontractors are typically liable for damages, work stoppages, and injuries if proper locates weren't completed. Always confirm valid BC One Call or Alberta One-Call tickets before breaking ground.
BOEM (Bureau of Ocean Energy Management)
ComplianceThe U.S. federal agency overseeing offshore energy leasing on the Outer Continental Shelf. Subcontractors working U.S. offshore projects must meet BOEM-driven compliance requirements set by their prime contractors. Permits and operational approvals from BOEM directly affect project timelines and mobilisation schedules.
Management of Change
ComplianceA formal process for documenting and approving any deviation from original scope, equipment, or procedures on a worksite. Subcontractors must follow the prime contractor's MOC process before making field changes. Skipping this step can void your contract or expose your crew to liability.
Latest Compliance News
Red Seal $5,000 Completion Bonus Portal Opens Nov. 16
Canadian journeypersons certified in a Red Seal trade on or after April 1, 2025 can apply for a $5,000 federal bonus starting Nov. 16, 2026. Here is what employers should prepare now.
2 days agoComplianceTraffic Exposure Was the Top Hazard on Caltrans LA Tunnel Relighting
On Aldridge Electric's I-405/I-105 tunnel relighting in Los Angeles, traffic breaches drove the safety plan. Here is what electrical and traffic control subs can take from it before bidding live-traffic work.
4 days agoComplianceFinning Fined $155K After 2023 Loader Injury Near Fort McMurray
Finning International pleaded guilty to an Alberta OHS Code count after a worker was struck by a moving loader in 2023. The $155,000 creative sentence funds third-party-site safety training.
5 days agoComplianceMIOSHA Cites MDOT Over Lane Closure in Fatal U.S. 127 Crash
MIOSHA found MDOT failed to close a lane during a rolling pothole repair on U.S. 127 where two road workers died in May. Highway maintenance subs should review their own moving-operation traffic control.
7 days agoRelated Guides
When a Jobsite Incident Happens: What Field Workers Need to Know Before Signing Anything
What to do after a jobsite injury or incident, what your rights are before signing incident reports, how workers' compensation works, and how to protect yourself on multi-employer worksites.
Compliance GuideOSHA Citations on Multi-Employer Worksites: What Subcontractors Need to Know
Learn how OSHA's multi-employer citation policy works, why subcontractors get cited for hazards they didn't create, and how to protect your company on operator-controlled job sites.
Compliance GuideHow to Read and Negotiate an Oilfield Master Service Agreement (MSA): A Subcontractor's Guide
Learn which MSA clauses actually matter for oilfield subcontractors: indemnity, insurance, payment terms, and change orders. Know what you're signing.
Stay sharp on field operations
Industry news and insights, delivered to your inbox.
Subscribe to FieldNews