Short-term, unplanned jobs awarded without a long-term contract, typically filled on short notice. Subcontractors are engaged for a single scope or site visit at a negotiated day rate. Common in shutdown, turnaround, and emergency maintenance situations.
Spot Work
Related Terms
Critical Path
IndustryThe sequence of tasks that directly controls a project's completion date. Delays to any critical path activity push the whole project's finish date back. Subcontractors on critical path work face tighter scrutiny and stronger pressure to meet scheduled milestones.
Waterway Crossing
IndustryA section of pipeline, conduit, or cable routed beneath or across a river, creek, or other body of water. Crossings typically use methods like horizontal directional drilling (HDD) or open-cut trenching. Subcontractors must meet strict environmental permits and inspection requirements before and after installation.
Spud Date
IndustryThe date when drilling begins on a new well. Marks the start of drilling operations.
Gathering System
IndustryA network of pipelines, compressors, and facilities that collect hydrocarbons from wellheads and move them to processing points. Subcontractors frequently support construction, inspection, and maintenance work across these systems. Scopes can span remote multi-well pads, requiring strong logistics and crew coordination.
Hydrovac
IndustryA truck-mounted unit that uses pressurised water and a vacuum system to excavate soil safely around buried utilities. Subcontractors are frequently hired for hydrovac work on pipeline, civil, and utility projects. It is preferred over mechanical digging in areas with high strike risk.
Completions
IndustryThe phase of oil and gas well development after drilling is finished, encompassing the work required to prepare a well for production — including perforating, fracturing, and installing wellhead equipment. For subcontractors, completions represent a concentrated burst of high-demand field work where specialised crews, equipment, and services are mobilised under tight timelines.
Latest Industry News
Canada Greenlights 1M-Bpd Alberta-to-Pacific Pipeline for 2027 Start
Canada and Alberta unveiled plans for a new 1-million-barrel-per-day pipeline from the oil sands to British Columbia's coast, with construction targeted to start as early as September 2027.
21 hours ago IndustryData Centers Drive Growth as Office, Warehouse Spending Sinks
Construction Dive reports private nonresidential spending fell 6.6% year over year through May, with data centers the lone bright spot as office and warehouse work slump.
21 hours ago IndustryDC Releases Draft Master Plan for RFK Stadium Campus Redevelopment
DC's draft master plan for the 180-acre RFK campus outlines phased street, transit and utility upgrades tied to a new Washington Commanders stadium and mixed-use districts.
21 hours ago IndustryNew Mexico Adopts $150K Bonding Rule for High-Risk Wells
New Mexico's Oil Conservation Commission approved new bonding requirements for high-risk and inactive wells, aiming to shift orphaned well plugging costs onto operators.
21 hours agoRelated Guides
How Operator Mergers and Acquisitions Affect Your Subcontract Agreements
When operators merge, get acquired, or sell assets, subcontractor agreements are caught in the middle. Learn how M&A activity affects your MSA, payment terms, vendor status, and what to do before, during, and after a deal closes.
Industry GuideHow Rig Count Trends Affect Subcontractor Demand and What to Do About It
Rig counts are the earliest signal of where field service work is heading. Learn how to read drilling activity trends, anticipate demand shifts, and position your crew before the phone stops ringing.
Industry GuideWhat Is an AFE in Oil and Gas and How Does It Affect Subcontractor Payments?
An AFE (Authorization for Expenditure) controls every dollar spent on an oilfield project. Learn how it affects your billing, change orders, and cash flow as a subcontractor.
Stay sharp on field operations
Industry news and insights, delivered to your inbox.
Subscribe to FieldNews