FieldNews
Subscribe

Daily oil & gas and construction news for subcontractors

ComplianceGlossary Term

Permit Durability

The length of time a work permit remains valid before requiring renewal or reissuance. Short permit durability can stall field crews and create costly downtime between tasks. Subcontractors should confirm permit expiry windows before scheduling labour and equipment.

Related Terms

Reauthorization

Compliance

Formal renewal of a previously approved work permit, purchase order, or scope of work that has expired or exceeded its original limits. Subcontractors must secure reauthorization before continuing work to avoid unpaid labour exposure. Delays in reauthorization can stall field crews and disrupt project schedules.

JHA (Job Hazard Analysis)

Compliance

A written document identifying hazards and controls for a specific task before work begins. Subcontractors are typically required to complete and submit JHAs to the prime contractor or site owner. Failure to have a compliant JHA on site can result in work stoppages or disqualification from bidding.

Resource Road

Compliance

A privately maintained access road built to reach remote work sites in oil & gas or forestry operations. Subcontractors must follow strict user agreements covering speed limits, radio protocols, and load restrictions. Non-compliance can result in access suspension, halting your crew's ability to reach site.

Osha (occupational Safety and Health Administration) Recordable

Compliance

A work-related injury or illness that must be logged on an OSHA 300 form. This includes incidents requiring medical treatment beyond first aid, restricted work, or lost time. High recordable rates can disqualify subcontractors from bidding on major operator contracts.

Surface Impoundment

Compliance

A contained, lined pit or pond used to collect, store, or treat liquid waste on a work site. Subcontractors working near these structures must follow strict handling and access protocols. Improper interaction with surface impoundments can trigger environmental compliance violations and halt operations.

Greenhouse Gas Inventory

Compliance

A documented record of all GHG (Greenhouse Gas) emissions generated by your operations, including equipment, vehicles, and fuel use. Prime contractors increasingly require subcontractors to submit one for project bids. Accurate tracking helps avoid compliance penalties and supports contract eligibility.

Stay sharp on field operations

Industry news and insights, delivered to your inbox.

Subscribe to FieldNews
A community project byAimsio