FieldNews
Subscribe

Daily oil & gas and construction news for subcontractors

ComplianceGlossary Term

Operator Certification

Related Terms

811 (call Before You Dig)

Compliance

A free national service requiring subcontractors to notify utility companies before any ground disturbance. Utilities mark underground lines within 48–72 hours, reducing strike risk. Non-compliance can result in serious liability, fines, and project shutdowns.

API (American Petroleum Institute)

Compliance

The leading industry organisation that develops technical standards, safety protocols, and equipment specifications that subcontractors must follow when working on oil and gas projects. API certifications and compliance with API standards are often mandatory requirements in service contracts and can affect your ability to bid on projects.

Reactive Hazards

Compliance

Materials or conditions that can cause fires, explosions, or toxic releases through chemical reactions when exposed to heat, water, or other substances. Subcontractors must identify these hazards before work begins and follow site-specific handling protocols. Common examples in oilfield and construction work include peroxides, unstable gases, and certain drilling chemicals.

Private Utility

Compliance

A utility line owned and maintained by a private company or landowner, not a public provider. These lines may not appear on municipal locate requests, creating hidden strike risks. Subcontractors must request owner-supplied records before any ground disturbance.

Environmental Review

Compliance

A formal assessment required before mobilising to site, confirming your work scope meets environmental regulations. Subcontractors may need to submit documentation or hold specific certifications to pass. Delays in approval can push your start date and affect project cash flow.

Fit Testing

Compliance

A mandatory procedure verifying that a respirator forms a proper seal on a worker's face. Subcontractors must ensure all personnel complete fit testing before entering sites with respiratory hazards. Most prime contractors require valid fit test records as part of site access documentation.

Stay sharp on field operations

Industry news and insights, delivered to your inbox.

Subscribe to FieldNews
A community project byAimsio