FieldNews
Subscribe

Daily oil & gas and construction news for subcontractors

ComplianceGlossary Term

Induced Seismicity

Human-caused ground tremors triggered by oilfield operations like hydraulic fracturing or wastewater disposal. Regulators may issue stop-work orders, directly halting your field operations. Subcontractors should track local seismic thresholds, as exceeding them can suspend permits and delay project timelines.

Related Terms

USMCA (United States-mexico-canada Agreement)

Compliance

A trilateral trade agreement governing cross-border movement of equipment, materials, and services between Canada, the U.S., and Mexico. Subcontractors working across borders must ensure goods and labour comply with USMCA rules of origin to avoid tariffs. It also affects visa and work permit eligibility for field personnel deployed internationally.

Designer of Record

Compliance

The licensed engineer or firm legally responsible for a project's design documents and specifications. Subcontractors must follow their approved drawings exactly — any field changes require written authorisation from the Designer of Record. Deviating without approval can void liability protection and trigger compliance issues.

Methane Emissions Rule

Compliance

A federal or provincial regulation requiring oil and gas operators to detect and reduce methane leaks from equipment and facilities. Subcontractors performing work on wellsites, pipelines, or processing equipment may need to meet specific leak detection and repair (LDAR) standards. Non-compliance can result in fines or disqualification from operator contracts.

Call 811

Compliance

North American one-call notification service subcontractors must contact before excavation to have underground utilities located and marked. Skipping this step can cause utility strikes, project shutdowns, and personal liability for damages. Most jurisdictions require proof of notification before digging permits are issued.

Treaty-Based Impact Assessment

Compliance

A formal review process evaluating how a project affects Indigenous rights under specific treaties. Subcontractors may face work stoppages or scope changes if assessments flag concerns. Understanding active treaty areas helps crews anticipate permitting delays and access restrictions.

Utility Locating

Compliance

The process of identifying and marking underground utilities before excavation begins. Subcontractors are often required to confirm locates are valid before breaking ground. Failure to comply can result in strikes, liability, and work stoppages.

Stay sharp on field operations

Industry news and insights, delivered to your inbox.

Subscribe to FieldNews
A community project byAimsio