FieldNews
Subscribe

Daily oil & gas and construction news for subcontractors

IndustryGlossary Term

Frac Water Logistics

The planning and execution of sourcing, transporting, and disposing of water used in hydraulic fracturing operations. Subcontractors may be engaged for trucking, pipeline installation, pumping, or water treatment services. Accurate job scoping is critical, as water volumes and haul distances directly affect equipment needs and bid pricing.

Related Terms

SCADA (Supervisory Control and Data Acquisition)

Industry

A control system that monitors and manages field equipment like pipelines, compressors, and wellheads in real time. Subcontractors working on SCADA-connected sites must follow strict access and cybersecurity protocols. Your work may trigger automated alarms or shutdowns if procedures aren't followed precisely.

Viaduct

Industry

A long elevated bridge structure carrying roads or pipelines over valleys, water, or rough terrain. Subcontractors working near viaducts must account for access restrictions and specialised rigging requirements. Inspection and maintenance contracts on viaducts often require working-at-heights certification.

Leasehold

Industry

Land or mineral rights an operator has legally secured through a lease agreement with the landowner or Crown. Subcontractors typically work within leasehold boundaries, so access, permitting, and site rules are set by the operator holding the lease. Understanding leasehold limits helps crews avoid trespassing on adjacent unlicensed areas.

SMR (Small Modular Reactor)

Industry

A compact, factory-built nuclear power unit used to generate on-site electricity for remote industrial facilities and resource projects. For subcontractors, SMR sites represent emerging work in civil, electrical, and mechanical trades. Expect strict federal nuclear safety compliance requirements affecting worker certifications and site access.

Condensate

Industry

A light liquid hydrocarbon that separates from natural gas during production and processing. Subcontractors handling condensate must follow strict hazmat protocols, as it is highly volatile and flammable. It is often measured and valued separately from crude oil on production sites.

Work Order

Industry

A formal document issued by a client or general contractor authorising a subcontractor to perform a specific scope of work. It outlines the job details, location, timeline, and agreed rate. Subcontractors typically cannot invoice without a valid work order number.

Stay sharp on field operations

Industry news and insights, delivered to your inbox.

Subscribe to FieldNews
A community project byAimsio