FieldNews
Subscribe
Industry Glossary Term

Deferred Maintenance

Upkeep or repair work that has been postponed by an asset owner due to budget constraints or scheduling conflicts. For subcontractors, deferred maintenance often triggers urgent, high-volume scopes when work is finally released. Expect compressed timelines, ageing equipment, and increased safety hazards on these jobs.

Related Terms

Mud Reclaimer

Industry

A piece of solids-control equipment that separates reusable drilling fluid from cuttings on the rig site. Subcontractors operating or maintaining this unit help reduce fluid disposal costs and waste volumes. It is commonly found in directional drilling and HDD (Horizontal Directional Drilling) scopes.

Switchgear

Industry

Electrical equipment used to control, protect, and isolate power systems on job sites. Subcontractors working near switchgear must follow strict lockout/tagout procedures. Installation and maintenance work often requires certified electricians and site-specific safety permits.

Undeveloped Inventory

Industry

Approved but undrilled well locations or untapped reserves an operator plans to develop in future phases. For subcontractors, it signals upcoming work pipelines and potential long-term contract opportunities. Tracking an operator's undeveloped inventory helps you anticipate mobilisation timelines and resource planning.

Modular Camp

Industry

A prefabricated, relocatable accommodation facility used to house workers on remote oil & gas or construction sites. Units are shipped and assembled on-site, then dismantled when the project ends. Subcontractors may bill camp costs separately or include them in their overall project pricing.

CCUS (Carbon Capture, Utilization, and Storage)

Industry

Technology that captures CO₂ emissions from industrial sites and either stores or repurposes them. Subcontractors are increasingly hired to build, maintain, and service CCUS infrastructure. Familiarity with these projects opens doors to growing work in emissions-reduction programmes.

Preconstruction

Industry

The planning phase before field work begins, covering scope review, site assessments, and schedule alignment with the GC. Subcontractors are often engaged during this phase to provide pricing, labour forecasts, and constructability input. Early involvement can improve mobilisation timelines and reduce costly scope changes later.

Stay sharp on field operations

Industry news and insights, delivered to your inbox.

Subscribe to FieldNews
A community project by Aimsio