Debottleneck

To identify and remove constraints limiting throughput or efficiency on a project or facility. For subcontractors, this often means mobilising additional crews or equipment to clear backlogs. Work is typically urgent and can command premium rates.

Related Terms

Minimum Work Program

Industry

A contractually obligated set of activities and expenditures an operator must complete within a set timeframe, typically tied to a licence or lease agreement; for subcontractors, this creates predictable scopes of work and mobilisation opportunities as operators must execute these commitments or risk losing their rights to the asset.

Crane Mats

Industry

Large interlocked timber or composite panels placed under crane outriggers to distribute load on soft or unstable ground. Subcontractors often supply, transport, and install them as part of site prep scopes. Rental and mobilisation costs should be clearly itemised in your quote.

Lng (liquefied Natural Gas) Train

Industry

A single end-to-end processing unit that cools natural gas into liquid form for storage and export. Large LNG facilities run multiple trains, each requiring dedicated construction, maintenance, and shutdown crews. Subcontractors are typically mobilised per train, making scope and schedule highly compartmentalised.

Bore Path

Industry

The planned underground route a drill bit follows during horizontal directional drilling (HDD). Subcontractors use bore path data to plan equipment placement, crew positioning, and utility clearances. Deviations from the bore path can trigger rework costs and schedule delays.

Tubulars

Industry

Steel pipes used in drilling and well construction, including casing, tubing, and drill pipe. Subcontractors handling tubulars must follow strict inspection and handling procedures. Damage during your scope can result in costly liability claims.

Spoil Pile

Industry

Excavated soil, rock, or debris removed during trenching or grading and stockpiled on-site. Subcontractors are often responsible for its placement, management, and disposal per site plans. Improper handling can trigger environmental compliance issues and project delays.