FieldNews
Subscribe

Daily oil & gas and construction news for subcontractors

IndustryGlossary Term

Core Desorption

A lab process where gas is measured as it releases from rock core samples pulled during drilling. Subcontractors handling or transporting cores must follow strict protocols to preserve sample integrity. Mishandling can compromise data and trigger costly disputes with operators.

Related Terms

Boe/d (barrels of Oil Equivalent Per Day)

Industry

A standard measure of a well site's or facility's total energy output, combining oil, gas, and NGLs into one comparable unit. Operators use BOE/D figures to size projects and determine crew and equipment requirements. Higher BOE/D rates typically signal larger scopes of work and longer service contracts for subcontractors.

Ngl (natural Gas Liquids) Value Chain

Industry

The full sequence of extracting, processing, transporting, and selling natural gas liquids such as propane, butane, and ethane. Subcontractors work across multiple stages, including plant turnarounds, pipeline installation, and fractionation facility maintenance. Activity levels and contract demand shift depending on which part of the chain is seeing investment.

Reinforcing Bar (rebar)

Industry

Steel bars embedded in concrete to add tensile strength in foundations, structures, and infrastructure builds. Subcontractors handling rebar must account for material costs, placement labour, and tie wire in their bids. Improper installation can trigger costly rework and inspection failures.

Self-Build

Industry

A project where the owner acts as their own general contractor, hiring subcontractors directly rather than through a prime contractor. For field service companies, this often means faster access to work but requires closer coordination with the owner. Payment terms and scope changes are negotiated directly, so clear contracts are essential.

Interconnection

Industry

The physical linking of two or more systems, pipelines, or electrical networks at a shared tie-in point. For subcontractors, interconnection work often requires strict coordination with the prime contractor and operator. Scope boundaries and handoff responsibilities must be clearly defined in your subcontract.

MRP (Materials Requirements Planning)

Industry

A scheduling system that calculates what materials are needed, in what quantities, and when. Subcontractors use it to avoid shortages or excess stock on job sites. It ties material orders directly to project timelines and scopes of work.

Stay sharp on field operations

Industry news and insights, delivered to your inbox.

Subscribe to FieldNews
A community project byAimsio