FieldNews
Subscribe
Compliance Glossary Term

Utility Locating

The process of identifying and marking underground utilities before excavation begins. Subcontractors are often required to confirm locates are valid before breaking ground. Failure to comply can result in strikes, liability, and work stoppages.

Related Terms

TRC (Texas Railroad Commission)

Compliance

The TRC regulates oil, gas, and pipeline operations in Texas. Subcontractors must meet TRC requirements for permits, well operations, and environmental compliance. Non-compliance can halt work and affect contractor eligibility on job sites.

TDG (Transportation of Dangerous Goods)

Compliance

Federal Canadian regulations governing how hazardous materials are transported by road, rail, or air. Subcontractors hauling fuels, chemicals, or compressed gases must carry proper documentation and placards. Non-compliance can result in fines, work stoppages, or loss of site access.

Permit Filings

Compliance

Official documentation submitted to regulatory bodies before starting work on a site. Subcontractors may be responsible for obtaining specific trade or activity permits. Delays in filings can halt work and affect project timelines and invoicing.

Venting

Compliance

The controlled release of gases from pipelines, vessels, or equipment during maintenance, commissioning, or decommissioning work. Subcontractors must follow site-specific venting procedures to remain compliant with environmental and safety regulations. Improper venting can result in work stoppages, fines, or removal from site.

Tier 2 Diesel Engine

Compliance

A diesel engine meeting EPA (Environmental Protection Agency) Tier 2 emissions standards, regulating nitrogen oxide and particulate output. Many job sites and municipalities restrict or ban Tier 2 equipment in favour of cleaner Tier 4 units. Subcontractors should verify equipment tier requirements before mobilising to avoid costly compliance issues or equipment swaps.

Stop-Before-Strike

Compliance

A mandatory work pause requiring crews to verify no buried utilities or underground hazards exist before digging or drilling begins. Subcontractors are typically contractually responsible for completing all locates and documented checks before breaking ground. Failure to comply can void insurance coverage and expose your company to full liability for strikes.

Stay sharp on field operations

Industry news and insights, delivered to your inbox.

Subscribe to FieldNews
A community project by Aimsio