FieldNews
Subscribe
Compliance Glossary Term

Trench Safety Stand Down

A mandatory work stoppage where all excavation and trenching crews halt operations to review cave-in prevention and protective system requirements. Subcontractors must ensure workers, supervisors, and equipment operators participate before resuming ground-breaking work. Primes may require documented sign-off proving your crew completed the stand down.

Related Terms

STCKY (Stuff That Can Kill You)

Compliance

Informal field term for high-consequence hazards requiring mandatory controls before work begins. For subcontractors, STCKY items typically appear on permit-to-work forms and site safety plans. Failing to identify and mitigate STCKY hazards can void your contract and expose your company to liability.

Environmental Impact Statement (eis)

Compliance

A formal document assessing a project's environmental effects before work begins. Subcontractors must align their operations with EIS commitments or risk work stoppages. Scope changes that violate EIS conditions can trigger costly regulatory reviews.

LFI (Learning From Incidents)

Compliance

A formal process where incident findings are shared across crews and job sites to prevent repeat occurrences. Subcontractors are often required by operators to distribute LFIs to their workforce and document acknowledgement. Failure to action LFIs can affect your standing on approved vendor lists.

CCR (Coal Combustion Residuals)

Compliance

Solid and liquid waste materials produced by coal-fired power plants, including fly ash, bottom ash, and scrubber sludge. Subcontractors handling CCR sites must follow strict federal regulations governing storage, disposal, and remediation. Improper handling can trigger significant liability, so verify site-specific CCR compliance requirements before mobilising.

MI (Mechanical Integrity)

Compliance

A regulatory and operational standard confirming that pressure-containing equipment is fit for service and free from defects. Subcontractors working on vessels, pipelines, or wellheads must often meet MI requirements before commencing work. Non-compliance can halt operations and trigger liability for field service crews.

Energy Control Program

Compliance

A documented system requiring subcontractors to isolate and de-energise equipment before maintenance or service work begins. It defines lockout/tagout procedures, worker responsibilities, and verification steps. Prime contractors often audit subcontractor programs before awarding site access.

Stay sharp on field operations

Industry news and insights, delivered to your inbox.

Subscribe to FieldNews
A community project by Aimsio