FieldNews
Subscribe

Daily oil & gas and construction news for subcontractors

IndustryGlossary Term

SPMT (Self-propelled Modular Transporter)

A multi-axle hydraulic platform vehicle used to move oversized modules, vessels, or heavy equipment on job sites. Subcontractors working heavy lifts or module installation scopes often coordinate directly with SPMT crews. Understanding load-out and transport sequencing is critical for scheduling your own work around these moves.

Related Terms

Alternative Delivery

Industry

A project procurement model where design and construction are bundled under one contract, such as design-build or EPC. Subcontractors often engage through a prime contractor rather than directly with the owner. Scope, risk, and payment terms can differ significantly from traditional bid-build arrangements.

Transportation Electrification

Industry

The shift from diesel-powered trucks and equipment to electric or hybrid alternatives on job sites and haul routes. For subcontractors, this affects fleet investment decisions, charging infrastructure needs, and site logistics. Some client contracts now require or incentivise electrified transport to meet emissions targets.

Generation Capacity

Industry

The maximum electrical output a power generation unit can reliably produce, measured in kilowatts or megawatts. For field crews, it determines whether on-site generators can handle equipment loads at remote worksites. Subcontractors must verify capacity before mobilising power-intensive tools or machinery.

Marine Construction

Industry

Offshore and nearshore infrastructure work including platform installation, subsea pipelines, and dock or jetty builds. Subcontractors often face strict vessel access requirements and marine safety certifications. Mobilisation costs and weather delays are major contract risk factors.

Fractionating Tower

Industry

A large vertical vessel at refineries and gas plants that separates hydrocarbons into usable products like propane, naphtha, and diesel. Subcontractors are frequently called in for turnaround maintenance, inspection, and refractory work on these units. Access planning and confined space protocols are critical for any scope inside the tower.

Roadway Decking

Industry

Temporary modular panels laid over pipelines, cables, or trenches to allow vehicle and equipment traffic across a work site. Subcontractors are often responsible for installation, load-rating compliance, and removal. Costs are typically billable as a mobilisation or site-prep line item.

Stay sharp on field operations

Industry news and insights, delivered to your inbox.

Subscribe to FieldNews
A community project byAimsio