Mesh filters mounted on shale shakers that separate drill cuttings from drilling fluid on the rig. Subcontractors handling fluid management or solids control must track screen condition and swap them regularly. Damaged or plugged screens slow operations and can trigger downtime charges against your crew.

Related Terms

Interconnection Delay

Industry

A postponement caused by unfinished grid or pipeline tie-in work that prevents a facility from going live. For subcontractors, it often means demobilisation holds, scope gaps, or standby costs with no clear end date. Document all waiting time carefully to support delay claims or change orders.

Pre-Bid

Industry

The preparation phase before submitting a formal tender, where subcontractors review scope documents and estimate costs. It includes site visits, vendor quotes, and risk assessments. Strong pre-bid work helps avoid costly surprises once a contract is awarded.

Satellite Jetty

Industry

A secondary or auxiliary dock located away from a main terminal, used to load or offload vessels at remote points along a waterway. Subcontractors may be mobilised specifically to satellite jetties for marine construction, maintenance, or material handling work. Access and logistics can differ significantly from main terminals, affecting crew scheduling and equipment mobilisation.

Life Extension

Industry

A formal process that prolongs the operational life of ageing assets beyond their original design lifespan. For subcontractors, it often means increased inspection, repair, and maintenance scopes. Expect stricter compliance requirements and potential for longer-term service contracts.

Gas Sales Precedent Agreement

Industry

A conditional agreement between a producer and gas buyer that must be satisfied before a project moves to full development. For subcontractors, it signals that major field mobilisation and long-term work commitments depend on this deal closing. Delays or failed negotiations can stall contracts, procurement, and crew deployment.

CIPP (Cured-in-place Pipe)

Industry

A trenchless pipe rehabilitation method where a resin-saturated liner is inserted into a damaged pipe and hardened in place. Subcontractors typically provide specialised crews, inversion or pull-in equipment, and UV or steam curing systems. Common in municipal, oil and gas, and industrial pipeline maintenance scopes.