Sanctioned Project

A project that has received formal capital approval from an operator or owner company and is cleared to proceed. For subcontractors, sanction signals that contracts, purchase orders, and mobilisation timelines are imminent. It marks the point where bidding activity converts into confirmed field work.

Related Terms

Antifriction Bearing

Industry

A bearing that uses rolling elements — balls or rollers — to reduce friction between moving parts. Common in pumps, motors, and rotating equipment on job sites. Subcontractors should inspect and replace these during scheduled maintenance to avoid unplanned downtime.

FEED (Front-end Engineering Design)

Industry

The detailed engineering phase before a project is sanctioned for full construction. For subcontractors, FEED signals that scopes, specs, and vendor lists are being finalised. Winning work during FEED often positions your company for contracts in the execution phase.

Hydrogen Hub

Industry

A centralised facility or region where hydrogen is produced, stored, and distributed at scale. For subcontractors, these projects generate long-term work in pipefitting, instrumentation, and equipment installation. Expect strict safety certifications and specialised trade requirements on site.

Hydrostatic Testing

Industry

A pressure integrity test where pipelines, vessels, or equipment are filled with water and pressurised to detect leaks or weaknesses. Subcontractors are often hired to perform or witness these tests before commissioning. Proper documentation is critical, as clients and regulators require certified test records.

Undeveloped Inventory

Industry

Approved but undrilled well locations or untapped reserves an operator plans to develop in future phases. For subcontractors, it signals upcoming work pipelines and potential long-term contract opportunities. Tracking an operator's undeveloped inventory helps you anticipate mobilisation timelines and resource planning.

Stress-Corrosion Cracking

Industry

A failure mode where metal components crack under the combined effect of tensile stress and corrosive environments. Subcontractors must inspect susceptible equipment — like pipelines, pressure vessels, and lifting gear — for early signs. Missed SCC (Stress-Corrosion Cracking) damage can trigger costly shutdowns, liability claims, or failed inspections.

Stay sharp on field operations

Industry news and insights, delivered to your inbox.

Subscribe to FieldNews
A community project by Aimsio