Status indicating a drilling rig has been formally stood down and all associated services are no longer required. For subcontractors, it triggers demobilisation, final invoice submission, and crew release. Contracts often specify notice periods and standby rates tied to this status.
Rig-Released
Related Terms
FID (Final Investment Decision)
IndustryThe point when a project owner formally approves funding and commits to proceeding with a major project. For subcontractors, FID is the trigger that converts preliminary work into confirmed scopes and purchase orders. Mobilisation planning, crew hiring, and equipment sourcing typically begin after FID is announced.
Mission Critical
IndustryDescribes any task, system, or equipment whose failure would halt operations or create serious safety risks. For subcontractors, mission critical work often carries stricter response times, higher liability, and tighter documentation requirements.
Well Lifecycle
IndustryThe full sequence of a well's existence, from drilling and completion through production and eventual abandonment. For subcontractors, each phase represents distinct scopes of work, crew requirements, and contract opportunities. Understanding the lifecycle helps you anticipate project transitions and position for follow-on work.
Derivative Goods
IndustryProducts created by processing or transforming raw materials supplied under a contract, such as fabricated components or treated fluids. Subcontractors must clarify ownership rights over derivative goods before work begins. Contracts often assign these rights to the prime contractor or client by default.
Horizontal Well
IndustryA well that is drilled vertically to a certain depth then curved to run horizontally through a target formation, requiring subcontractors to mobilise specialised equipment and crews for extended-reach drilling, completions, and stimulation work that typically involves more complex logistics and longer on-site durations than conventional vertical wells.
Construction Manager At Risk
IndustryA delivery model where a construction manager guarantees a maximum project cost and takes on financial risk if it's exceeded. Subcontractors are hired by the CM, not the owner, making the CM your direct client and contract holder. Your scope, payments, and change orders all flow through the CM.
Latest Industry News
Obsidian Energy Completes 11-Well Peace River Program in Q1 2026
Obsidian Energy rig-released 11 wells across its Peace River assets in Q1 2026, targeting Clearwater and Bluesky formations. Field service companies in the region should watch for continued activity heading into Q2.
5 months agoIndustryBaker Hughes Lands Compression, Liquefaction Orders for Venture Global's Gulf Coast Buildout
Baker Hughes secured orders to supply gas compression for the Cloud Connector Pipeline and modular liquefaction equipment for Plaquemines LNG, expanding Venture Global's Louisiana infrastructure footprint.
11 hours agoIndustryInside Ole Miss's $1.3B Build-Out: A Master Class in Managing 170 Projects at Once
The University of Mississippi has 170 construction projects running simultaneously across its Oxford campus, a live test case in staging and sequencing that facility-construction firms bidding higher-ed work should study closely.
11 hours agoIndustry$408M Roosevelt Bridge Replacement Breaks Ground at Lake Texoma
ODOT and design-build team Zachry Construction/Traylor Bros. broke ground on the $408 million US-70 Roosevelt Bridge replacement over Lake Texoma, with completion targeted for fall 2029.
yesterdayRelated Guides
How Operator Mergers and Acquisitions Affect Your Subcontract Agreements
When operators merge, get acquired, or sell assets, subcontractor agreements are caught in the middle. Learn how M&A activity affects your MSA, payment terms, vendor status, and what to do before, during, and after a deal closes.
Industry GuideHow Rig Count Trends Affect Subcontractor Demand and What to Do About It
Rig counts are the earliest signal of where field service work is heading. Learn how to read drilling activity trends, anticipate demand shifts, and position your crew before the phone stops ringing.
Industry GuideWhat Is an AFE in Oil and Gas and How Does It Affect Subcontractor Payments?
An AFE (Authorization for Expenditure) controls every dollar spent on an oilfield project. Learn how it affects your billing, change orders, and cash flow as a subcontractor.
Stay sharp on field operations
Industry news and insights, delivered to your inbox.
Subscribe to FieldNews