Repair work performed after equipment has already failed or broken down. Subcontractors are often mobilised on short notice, commanding premium rates. Tight timelines increase crew fatigue and safety risks on site.
Reactive Maintenance
Related Terms
Telematics
IndustryA system that tracks vehicle and equipment location, usage, and performance data in real time. Subcontractors use it to monitor fleet activity, verify hours worked, and support billing accuracy. It also aids compliance with safety and maintenance requirements.
Shovel-Ready
IndustryA project with permits, funding, and engineering approved, allowing field work to begin immediately. For subcontractors, it signals that mobilisation and contract awards are imminent. Pursuing shovel-ready work reduces the risk of scoping delays eating into your margins.
ABC (Associated Builders and Contractors)
IndustryA U.S. trade association representing merit-shop contractors in construction and industrial sectors. Subcontractors use ABC membership for training resources, safety programmes, and industry networking. Membership can also signal credibility when bidding on open-shop projects.
Section 232 Tariffs
IndustryU.S. trade tariffs applied to imported steel and aluminium on national security grounds. For subcontractors, these tariffs raise material and equipment costs on cross-border projects. Budget carefully when quoting jobs that involve U.S.-sourced pipe, structural steel, or fabricated components.
Epc (engineering, Procurement, and Construction) Contractor
IndustryA company hired to deliver a project from design through build, acting as the main contractor above subcontractors. As a subcontractor, your client and contract holder is typically the EPC, not the asset owner. They control scope, scheduling, and invoice approval on site.
Medium Voltage Transformer
IndustryA device that steps electrical voltage up or down within the 1 kV to 35 kV range on industrial job sites. Subcontractors often work around these units when installing temporary power or connecting equipment. Strict lockout/tagout and electrical certification requirements apply near this equipment.
Latest Industry News
Allseas Wins Subsea Pipelay Contract for BC's PRGT-Ksi Lisims LNG Link
Western LNG has tapped offshore contractor Allseas to install a 50-kilometer subsea pipeline segment linking the Prince Rupert Gas Transmission line to the Ksi Lisims LNG export terminal, with work slated to start in 2029.
21 hours agoIndustryAmtrak Trims Scope on $6B Baltimore Tunnel Project as Construction Advances
Amtrak has adjusted the design of its $6 billion B&P Tunnel Replacement in Baltimore, cutting a ventilation facility and raising the track alignment, while tunnel boring and bridge work continue toward a 2036 opening.
21 hours agoIndustryBP Boosts Atlantis Output by 10,000 BOE/D in Gulf of Mexico
BP has expanded production at its Atlantis deepwater field in the Gulf of Mexico by 10,000 boe/d through new subsea water injection wells, extending the asset's producing life.
21 hours agoIndustryDulles' $20B Expansion Sets Up Phased Bid Calendar for Subs
USDOT's selection of a $20 billion Dulles Airport redevelopment plan expands MWAA's modernization program and puts a $4.5B-$5B design-build package on a fall RFP timeline, with construction targeted to start next spring.
21 hours agoRelated Guides
How Operator Mergers and Acquisitions Affect Your Subcontract Agreements
When operators merge, get acquired, or sell assets, subcontractor agreements are caught in the middle. Learn how M&A activity affects your MSA, payment terms, vendor status, and what to do before, during, and after a deal closes.
Industry GuideHow Rig Count Trends Affect Subcontractor Demand and What to Do About It
Rig counts are the earliest signal of where field service work is heading. Learn how to read drilling activity trends, anticipate demand shifts, and position your crew before the phone stops ringing.
Industry GuideWhat Is an AFE in Oil and Gas and How Does It Affect Subcontractor Payments?
An AFE (Authorization for Expenditure) controls every dollar spent on an oilfield project. Learn how it affects your billing, change orders, and cash flow as a subcontractor.
Stay sharp on field operations
Industry news and insights, delivered to your inbox.
Subscribe to FieldNews
