FieldNews
Subscribe
Industry Glossary Term

Mine Reclamation

The regulated process of restoring a mine site to an environmentally acceptable condition after operations cease. For subcontractors, it generates specialised scopes including grading, revegetation, and water treatment work. Reclamation projects often extend years beyond mine closure, providing longer-term contract opportunities.

Related Terms

Tubular Running

Industry

The process of installing pipe, casing, or tubing strings into a wellbore during drilling or completion operations. Subcontractors providing tubular running services supply specialised crews and equipment such as power tongs and elevators. Accurate job scoping is critical, as rig time is costly and delays directly affect invoicing and contract performance.

Trenchless

Industry

A method of installing or repairing underground pipelines and conduits without open excavation. Techniques include horizontal directional drilling (HDD) and pipe bursting. Subcontractors working trenchless scopes need specialised equipment and certified operators.

Strait of Hormuz

Industry

A critical shipping chokepoint between Oman and Iran controlling roughly 20% of global oil flow. Disruptions here can spike material costs and delay equipment deliveries for subcontractors. Budget contingencies and procurement timelines should account for geopolitical risk in this corridor.

In-Service Date

Industry

The date when equipment or a facility is officially commissioned and begins active operation. For subcontractors, this date often triggers billing milestones, warranty periods, or contract close-out requirements. Missing this date can result in penalties or delayed final payment.

Vam Connections

Industry

Premium threaded pipe connections used in oil and gas drilling and completion operations. Subcontractors handling, installing, or inspecting VAM connections must follow strict torque specs and handling procedures. Improper makeup can result in costly downhole failures and liability exposure.

Construction Manager At Risk

Industry

A delivery model where a construction manager guarantees a maximum project cost and takes on financial risk if it's exceeded. Subcontractors are hired by the CM, not the owner, making the CM your direct client and contract holder. Your scope, payments, and change orders all flow through the CM.

Stay sharp on field operations

Industry news and insights, delivered to your inbox.

Subscribe to FieldNews
A community project by Aimsio