Medium-Voltage Gear

Electrical switchgear and distribution equipment operating between 1 kV and 35 kV, commonly found on industrial sites and large construction projects. Subcontractors working near or on this equipment typically require specialised high-voltage certifications and site-specific safety training. Improper handling can trigger serious liability and compliance issues for your crew.

Related Terms

Dust Suppression

Compliance

The process of controlling airborne particulates on worksites using water trucks, chemical agents, or barriers. Subcontractors may be contractually responsible for dust suppression on access roads, laydown yards, or excavation sites. Failure to comply can result in stop-work orders or back-charges from the prime contractor.

Environmental Permitting

Compliance

The process of obtaining government approvals before starting work that may impact land, water, or air. Subcontractors must confirm permits are in place before mobilising — delays can halt work without pay. Missing or expired permits can expose your company to fines and contract termination.

MI (Mechanical Integrity)

Compliance

A regulatory and operational standard confirming that pressure-containing equipment is fit for service and free from defects. Subcontractors working on vessels, pipelines, or wellheads must often meet MI requirements before commencing work. Non-compliance can halt operations and trigger liability for field service crews.

Discovery Window

Compliance

The limited timeframe in which a subcontractor can identify and formally report hidden site conditions that differ from the original contract scope. Missing this window typically voids your right to claim additional compensation or schedule relief. Review your contract carefully — discovery windows can be as short as 24 to 72 hours after encountering the condition.

CEM (Continuous Emissions Monitoring)

Compliance

Automated systems that track pollutant outputs from equipment in real time. Subcontractors operating combustion equipment may be required to install, maintain, or provide data from these systems. Non-compliance can trigger work stoppages or contract penalties.

FAR (Federal Acquisition Regulation)

Compliance

The FAR governs purchasing rules for U.S. federal contracts, including subcontractor requirements on government-funded projects. If your prime contractor holds a federal contract, FAR clauses flow down and bind your work. These rules cover pricing, record-keeping, audits, and labour standards you must follow.