Load Path Planning

The process of mapping how heavy equipment or materials will be moved from origin to job site. Subcontractors must identify weight limits, road restrictions, and permit requirements along the route. Poor planning causes costly delays, fines, or equipment damage.

Related Terms

Hookup

Industry

The phase where installed equipment and systems are connected to utilities, instrumentation, and process lines. For subcontractors, hookup work often follows construction and represents a distinct, billable scope. Crews must coordinate closely with commissioning teams to avoid delays.

Carbon Dioxide Treater

Industry

A vessel or system used on oil and gas sites to remove CO2 (Carbon Dioxide) from produced gas or water streams. Subcontractors are often hired to install, service, and inspect these units. Proper handling requires H2S and pressure safety training.

Voluntary Cuts

Industry

Agreed reductions in oil production by member nations, typically OPEC (Organization of the Petroleum Exporting Countries) members, to stabilise prices. For subcontractors, these cuts often trigger project deferrals, reduced scope, and slower mobilisation schedules. Budget freezes from operators frequently follow, directly impacting field service award timelines.

Trenchless Technology

Industry

Methods for installing or repairing underground pipelines and conduits without open-cut excavation. Common techniques include HDD (Horizontal Directional Drilling) and pipe bursting. Subcontractors specialising in these methods often command premium rates due to reduced surface disruption and specialised equipment requirements.

Electrohydraulic (eh) Control System

Industry

A control system combining electrical signals and hydraulic power to operate valves, actuators, and process equipment. Subcontractors working on commissioning or maintenance must be qualified to work on both electrical and hydraulic components. Specialised certification and intrinsically safe tools are typically required on-site.

Phase Gate

Industry

A formal approval checkpoint where a project must meet defined criteria before work advances to the next stage. Subcontractors often cannot mobilise, invoice, or begin new scope until the client clears each gate. Delays at phase gates directly impact crew scheduling and cash flow.