The process of mapping how heavy equipment or materials will be moved from origin to job site. Subcontractors must identify weight limits, road restrictions, and permit requirements along the route. Poor planning causes costly delays, fines, or equipment damage.
Load Path Planning
Related Terms
Hookup
IndustryThe phase where installed equipment and systems are connected to utilities, instrumentation, and process lines. For subcontractors, hookup work often follows construction and represents a distinct, billable scope. Crews must coordinate closely with commissioning teams to avoid delays.
Carbon Dioxide Treater
IndustryA vessel or system used on oil and gas sites to remove CO2 (Carbon Dioxide) from produced gas or water streams. Subcontractors are often hired to install, service, and inspect these units. Proper handling requires H2S and pressure safety training.
Voluntary Cuts
IndustryAgreed reductions in oil production by member nations, typically OPEC (Organization of the Petroleum Exporting Countries) members, to stabilise prices. For subcontractors, these cuts often trigger project deferrals, reduced scope, and slower mobilisation schedules. Budget freezes from operators frequently follow, directly impacting field service award timelines.
Trenchless Technology
IndustryMethods for installing or repairing underground pipelines and conduits without open-cut excavation. Common techniques include HDD (Horizontal Directional Drilling) and pipe bursting. Subcontractors specialising in these methods often command premium rates due to reduced surface disruption and specialised equipment requirements.
Electrohydraulic (eh) Control System
IndustryA control system combining electrical signals and hydraulic power to operate valves, actuators, and process equipment. Subcontractors working on commissioning or maintenance must be qualified to work on both electrical and hydraulic components. Specialised certification and intrinsically safe tools are typically required on-site.
Phase Gate
IndustryA formal approval checkpoint where a project must meet defined criteria before work advances to the next stage. Subcontractors often cannot mobilise, invoice, or begin new scope until the client clears each gate. Delays at phase gates directly impact crew scheduling and cash flow.
Latest Industry News
Aecon-Led Group With First Nations Partners Signs Deal for Ontario BESS Project
Aecon Concessions and four First Nations and energy partners have signed a 20-year storage agreement with Ontario's IESO to build a 150 MW/1,200 MWh battery project in Norfolk County, targeting 2030 commercial operations.
11 hours agoIndustryAthabasca Spends $55M on Corner SAGD Prep, Holds Off Final Sanction
Athabasca Oil Corp is putting $55 million into site prep and engineering for Corner Phase 1 SAGD but has not yet issued a formal sanction, Oil Sands Magazine reports, as it awaits clarity on Alberta's fiscal framework.
11 hours agoIndustryCenterPoint Boosts Capex by $1.2B on Houston Growth, Large-Load Demand
CenterPoint Energy raised its 10-year capital plan by $1.2 billion, driven mostly by large-load interconnection requests and expanded downtown Houston substation work, T&D World reports.
11 hours agoIndustryFirstEnergy Cuts Lakewood Outage Time 98% With New Substation Transformer
FirstEnergy's Illuminating Co. installed the first of two new power transformers at its Lakewood Substation in Ohio, part of a reliability program that has already cut customer outage time 98% year over year.
11 hours agoRelated Guides
How Operator Mergers and Acquisitions Affect Your Subcontract Agreements
When operators merge, get acquired, or sell assets, subcontractor agreements are caught in the middle. Learn how M&A activity affects your MSA, payment terms, vendor status, and what to do before, during, and after a deal closes.
Industry GuideHow Rig Count Trends Affect Subcontractor Demand and What to Do About It
Rig counts are the earliest signal of where field service work is heading. Learn how to read drilling activity trends, anticipate demand shifts, and position your crew before the phone stops ringing.
Industry GuideWhat Is an AFE in Oil and Gas and How Does It Affect Subcontractor Payments?
An AFE (Authorization for Expenditure) controls every dollar spent on an oilfield project. Learn how it affects your billing, change orders, and cash flow as a subcontractor.
Stay sharp on field operations
Industry news and insights, delivered to your inbox.
Subscribe to FieldNews