FieldNews
Subscribe
Industry Glossary Term

Integration Gap

The disconnect that occurs when a subcontractor's systems cannot communicate directly with a prime contractor's or operator's software platforms. This forces crews to manually re-enter data such as timesheets, work orders, or inspection records. The result is delays, billing errors, and compliance risks in the field.

Related Terms

Easement

Industry

A legal right allowing access to land owned by someone else for a specific purpose, such as running pipelines or power lines. Subcontractors must confirm easement boundaries before mobilising equipment or breaking ground. Working outside easement limits can trigger legal liability and project shutdowns.

Reservoir Characterization

Industry

The process of mapping and analysing an underground reservoir's size, rock properties, and fluid content. Subcontractors use this data to understand scope for drilling, completions, and intervention work. It directly influences crew requirements, equipment specs, and contract duration.

AFE (Authorization for Expenditure)

Industry

A budgeting document used in oil and gas projects that outlines expected costs and seeks approval before work begins. Subcontractors often work under AFEs issued by operators.

Deepwater

Industry

Refers to offshore oil and gas operations conducted in water depths exceeding 300 metres, where subcontractors and field service crews must hold specialised certifications, work within stricter regulatory frameworks, and often face extended mobilisation timelines and higher equipment day-rates.

Lower 48

Industry

Refers to the contiguous United States, excluding Alaska and Hawaii. For subcontractors, it defines a common work jurisdiction with distinct regulatory, tax, and labour rules from Canadian or Alaskan operations. Mobilisation costs and compliance requirements differ significantly when crews cross into or out of this region.

Screening Circuit

Industry

A series of vibrating screens used on-site to separate solids by size from drilling fluids or aggregates. Subcontractors operating or maintaining this equipment must track run-hours carefully for service billing. Screen cloth replacement is a common scope item in solids-control contracts.

Stay sharp on field operations

Industry news and insights, delivered to your inbox.

Subscribe to FieldNews
A community project by Aimsio