Any activity that breaks soil, such as excavating, grading, or driving stakes. Subcontractors must obtain utility locates and permits before starting work. Skipping this step risks fines and liability for damaged lines.
Ground Disturbance
Related Terms
Traffic Control Plan
ComplianceA site-specific document outlining how vehicle and pedestrian movement will be managed safely around a worksite. Subcontractors are often required to submit one before mobilising crews near roads or active facilities. It typically details signage, flagging requirements, and designated haul routes.
Call 811
ComplianceNorth American one-call notification service subcontractors must contact before excavation to have underground utilities located and marked. Skipping this step can cause utility strikes, project shutdowns, and personal liability for damages. Most jurisdictions require proof of notification before digging permits are issued.
DOE (Department of Energy)
ComplianceA U.S. federal agency that regulates energy production, sets safety standards, and oversees projects involving nuclear, fossil fuel, and renewable energy. Subcontractors working on DOE-funded or DOE-regulated sites must meet strict compliance and security requirements. Contracts tied to DOE projects often include additional reporting obligations and certified personnel requirements.
Burn Ban
ComplianceA government-issued restriction prohibiting open burning, including burn barrels and brush fires, within a designated area. Subcontractors must halt any permitted burning activities immediately and may face project delays. Check with your site supervisor and local authority before resuming work involving open flame or debris disposal.
FTA (Federal Transit Administration)
ComplianceA U.S. federal agency that funds and regulates public transit infrastructure projects. Subcontractors working on federally funded transit construction must meet strict FTA compliance requirements. These include labour standards, safety protocols, and Buy America provisions for materials.
Methane Emissions Inventory
ComplianceA documented record of all methane releases from equipment and operations on a worksite. Subcontractors may be required to contribute data or maintain their own inventory to meet operator or regulatory reporting obligations. Accurate records help avoid penalties and support contract compliance.
Latest Compliance News
Red Seal $5,000 Completion Bonus Portal Opens Nov. 16
Canadian journeypersons certified in a Red Seal trade on or after April 1, 2025 can apply for a $5,000 federal bonus starting Nov. 16, 2026. Here is what employers should prepare now.
2 days agoComplianceTraffic Exposure Was the Top Hazard on Caltrans LA Tunnel Relighting
On Aldridge Electric's I-405/I-105 tunnel relighting in Los Angeles, traffic breaches drove the safety plan. Here is what electrical and traffic control subs can take from it before bidding live-traffic work.
4 days agoComplianceFinning Fined $155K After 2023 Loader Injury Near Fort McMurray
Finning International pleaded guilty to an Alberta OHS Code count after a worker was struck by a moving loader in 2023. The $155,000 creative sentence funds third-party-site safety training.
5 days agoComplianceMIOSHA Cites MDOT Over Lane Closure in Fatal U.S. 127 Crash
MIOSHA found MDOT failed to close a lane during a rolling pothole repair on U.S. 127 where two road workers died in May. Highway maintenance subs should review their own moving-operation traffic control.
7 days agoRelated Guides
When a Jobsite Incident Happens: What Field Workers Need to Know Before Signing Anything
What to do after a jobsite injury or incident, what your rights are before signing incident reports, how workers' compensation works, and how to protect yourself on multi-employer worksites.
Compliance GuideOSHA Citations on Multi-Employer Worksites: What Subcontractors Need to Know
Learn how OSHA's multi-employer citation policy works, why subcontractors get cited for hazards they didn't create, and how to protect your company on operator-controlled job sites.
Compliance GuideHow to Read and Negotiate an Oilfield Master Service Agreement (MSA): A Subcontractor's Guide
Learn which MSA clauses actually matter for oilfield subcontractors: indemnity, insurance, payment terms, and change orders. Know what you're signing.
Stay sharp on field operations
Industry news and insights, delivered to your inbox.
Subscribe to FieldNews