FieldNews
Subscribe

Daily oil & gas and construction news for subcontractors

ComplianceGlossary Term

FFR (Filtering Facepiece Respirator)

A disposable respiratory protective device that filters airborne particles, dust, and contaminants. Commonly required on oil and gas sites and construction worksites under occupational health regulations. Subcontractors must ensure crew members wear the correct FFR rating for each task and hazard level.

Related Terms

Heat Index

Compliance

A measure combining air temperature and humidity to reflect how hot conditions actually feel to workers. Subcontractors use it to assess heat stress risk and trigger mandatory rest breaks or work stoppages. Most site safety plans reference heat index thresholds to stay compliant with occupational health regulations.

RBI (Risk-based Inspection)

Compliance

A method that prioritises equipment inspections based on failure risk and consequence severity. Subcontractors may be required to follow RBI schedules set by operators rather than fixed calendar intervals. Understanding RBI helps field crews anticipate inspection scopes and mobilisation timing.

Heat Illness

Compliance

A range of conditions caused by overexposure to heat, from heat cramps and exhaustion to life-threatening heat stroke. Subcontractors working outdoor or industrial sites must monitor crew members and follow site heat stress protocols. Failing to manage heat illness risks can trigger regulatory violations and project shutdowns.

Struck-By Hazard

Compliance

A struck-by hazard refers to any situation on a worksite where personnel risk injury from a moving object, such as swinging loads, dropped tools, vehicles, or pressurised line failures — a leading cause of fatality that subcontractors must identify and control in their site-specific hazard assessments and toolbox talks. For field service crews working around heavy equipment, cranes, or high-traffic laydown yards, recognising and mitigating struck-by risks is a core compliance obligation under provincial occupational health and safety legislation.

Utility Locate

Compliance

A pre-dig service that identifies and marks underground utilities before excavation begins. Subcontractors are typically required to obtain a locate before breaking ground. Failure to do so can result in liability for damages, project shutdowns, or regulatory fines.

CMMC (Cybersecurity Maturity Model Certification)

Compliance

A U.S. Department of Defence framework requiring contractors to meet specific cybersecurity standards before bidding on federal contracts. For field subcontractors, it means your digital systems, devices, and data handling practices must pass a formal audit. Without certification, you may be disqualified from certain government-linked oil and gas or construction projects.

Stay sharp on field operations

Industry news and insights, delivered to your inbox.

Subscribe to FieldNews
A community project byAimsio