Energize

To bring electrical equipment or a system into a live, powered state on a job site. Subcontractors must confirm proper authorisation and lockout/tagout clearance before energizing any equipment. Premature energizing is a leading cause of worksite incidents and contractor liability.

Related Terms

Hazmat-Permitted Storage

Compliance

Designated facilities licenced to store hazardous materials such as fuel, chemicals, or drilling fluids under strict regulatory approval. Subcontractors must verify their storage sites hold valid permits before mobilising hazardous goods to a worksite. Non-compliance can trigger project shutdowns, fines, or loss of contract eligibility.

Shoring

Compliance

Temporary support structures used to stabilise trenches, excavations, or buildings during construction or repair work. Subcontractors are often required to install shoring before crews can safely enter a dig site. Proper shoring is a regulated safety requirement and failure to comply can result in work stoppages or liability.

CCR (Coal Combustion Residuals)

Compliance

Solid and liquid waste materials produced by coal-fired power plants, including fly ash, bottom ash, and scrubber sludge. Subcontractors handling CCR sites must follow strict federal regulations governing storage, disposal, and remediation. Improper handling can trigger significant liability, so verify site-specific CCR compliance requirements before mobilising.

360-Degree Site Documentation

Compliance

A site capture method using panoramic cameras to record full visual records of a worksite. Subcontractors use it to document pre-existing conditions before mobilising. It protects against liability disputes over damage or incomplete scopes.

CLA (Combined Licence Application)

Compliance

A single regulatory submission that covers both construction permit and operating licence for a facility, such as a nuclear plant. Subcontractors may face extended pre-qualification and compliance requirements tied to the CLA approval timeline. Work scopes and mobilisation dates are often contingent on CLA milestones.

Pre-Filing Waiver

Compliance

A written agreement where a subcontractor gives up the right to file a builders' or mechanics' lien before work begins. General contractors or owners often require it as a condition of awarding a contract. Review carefully — signing one limits your legal options if payment disputes arise.