FieldNews
Subscribe

Daily oil & gas and construction news for subcontractors

ComplianceGlossary Term

Alternative Risk Transfer

ART (Alternative Risk Transfer) covers non-traditional risk financing options outside standard insurance, such as captives or self-insurance pools. Subcontractors use ART programmes to manage liability exposure when conventional coverage is unavailable or too costly. Common in high-hazard field operations where standard insurers may decline coverage.

Related Terms

Cave-In Protection

Compliance

Mandatory safeguards required when workers enter excavations deeper than 1.2 metres. Methods include sloping, shoring, or trench boxes to prevent soil collapse. Subcontractors must have a competent supervisor on-site to assess and implement the correct system.

Safety-Critical Roles

Compliance

Positions where errors or unqualified personnel can directly cause injury, fatality, or major incident on a worksite. Common examples include H2S monitors, crane operators, and confined space attendants. Subcontractors must verify certifications and competency before placing workers in these roles.

Acclimatization

Compliance

The process of allowing workers to safely adjust to extreme heat, cold, or altitude before full-duty deployment. Most worksites and safety regulations require a structured acclimatization period for new or returning crew. Subcontractors must factor this non-productive time into scheduling and labour costs.

Powered Industrial Truck

Compliance

Any motorised vehicle used to move materials on a worksite, including forklifts, telehandlers, and order pickers. Subcontractors must ensure operators hold valid PIT certifications before deployment. Site clients often audit compliance records, so keep training documentation current and accessible.

Pinch Point

Compliance

A location where a worker's body part can be caught between moving and stationary objects. Common on heavy equipment, rigging, and rotating machinery at oil and gas and construction sites. Subcontractors must identify and guard pinch points during site hazard assessments.

Third-Party Representative

Compliance

An independent inspector or agent hired by an operator or owner to verify that field work meets contract specifications. They are not your direct client but hold authority to approve, reject, or halt work on site. As a subcontractor, their sign-off is often required before progress billing is accepted.

Stay sharp on field operations

Industry news and insights, delivered to your inbox.

Subscribe to FieldNews
A community project byAimsio