Alberta's $43.7B pipeline gets a route
Plus: US crude hits a record 13.9M b/d and Permian deals keep stacking up
๐ฅ The Big One
Alberta Files Route for a $35B to $43.7B West Coast Pipeline
Alberta and Ottawa just filed a formal route for a pipeline pegged at $35.2 billion to $43.7 billion, running from Bruderheim to a new terminal in Delta, B.C., largely following the existing Trans Mountain corridor and moving more than 1 million barrels a day. Trans Mountain Corp and Pembina Pipeline will build and operate it, with construction targeted to start as early as September 2027. Alberta's already sunk $18.3 million into planning, and Premier Danielle Smith is pitching it as a multi-decade revenue play. This is the biggest pipeline on the North American board right now, but the real hiring wave for welders, pipefitters and right-of-way crews is still more than a year out.
Read the full breakdown โโ๏ธ Editor's Take
Rig counts are climbing for the eighth straight week, US crude production just hit a record 13.934 million b/d, and Permian deal flow is stacking up fast with San Mateo's $752 million Cardinal buy and EON's 92-well Eddy County program. Add refiners running at 96.6% capacity chasing near-record margins, and you've got upstream and downstream both leaning on contractors at the same time. Alberta's pipeline mega-project is real money, but it's a 2027-and-beyond story. The actual hiring wave for welders, pipefitters and right-of-way crews is happening now in the Permian and Delaware Basin, not the oil sands, so book your Q3 capacity accordingly.
FieldNews Staff
This Week in 60 Seconds
- US Crude Output Hits Record 13.934M b/d
Texas hit 5.83M b/d and New Mexico set a record 2.37M b/d, both signaling more Permian completions work.
- $752M Delaware Basin Midstream Deal Closes This Month
San Mateo is buying Cardinal's gathering and processing assets, with closing expected by July 31.
- EON Cleared for 92-Well Permian Program
BLM and New Mexico approved EON's San Andres horizontal program in Eddy County, spud targeted July 2026.
- Alberta Regulator Fines Entrada $437K Over Unreported Spill
AER hit Entrada Resources with a $437,611.98 penalty for an unreported oil release in Clearwater County.
- Refiners Running Flat Out, Margins Near 2022 Highs
Gasoline crack spreads topped $53 a barrel, and refiners at max capacity usually means more turnaround work.
๐ Where the Work Is
- Permian Basin (West Texas & Southeast New Mexico) ๐ฅ HOT: Record crude output, a $752 million Delaware Basin midstream buy, and EON's 92-well San Andres program all point to a busy back half.
- Alberta ๐ฅ HOT: A $35.2 billion to $43.7 billion pipeline route just got filed and Pembina sanctioned a C$4.6 billion gas plant, stacking up years of construction work.
- Gulf Coast, Texas: Refiners are running at 96.6% of capacity chasing near-record margins, a good sign for turnaround and maintenance crews.
- Wyoming to Oklahoma corridor: South Bow and Bridger are building the final leg of an Alberta-to-Cushing pipeline, with land and survey work starting now ahead of mid-2027 construction.
- South Texas: SpaceX is set to break ground next month on an 8-mile gas pipeline to its Starbase launch site, a fresh opportunity for regional pipeline subs.
๐ข Open Windows
Bids, packages, and decisions with a clock on them.
Closing expected by Jul 31
San Mateo-Cardinal Midstream Acquisition. San Mateo JV buys Cardinal's Delaware Basin gathering and processing assets; watch for crew transitions.Spud targeted Jul 2026
EON Resources 92-Well Permian Program. San Andres horizontal drilling approved in Eddy County, NM; drilling and completions subs should reach out now.RFQ open now
California HSR Merced-to-Madera Civil Works. $2.4B civil package now out; utility, civil, and specialty subs should start tracking this procurement.Groundbreaking next month
SpaceX Starpipe Pipeline. 8-mile, 16-inch gas pipeline to Starbase breaks ground next month; south Texas pipeline subs should watch for solicitations.
๐ท Crew Market: Construction job openings hit a 10-month high of 298,000 in May, but the hiring rate matched an all-time low of 3.5%, a sign firms want crews faster than they can land them.
๐ The Number
1,700%
Canadian oil exports to Asia jumped from $500 million in 2023 to $9.3 billion in 2025, riding on Trans Mountain's expanded capacity. That kind of volume growth keeps west coast terminal and pipeline crews busy for years.
Canadian Energy Centre / ATB Economics via BOE Report
On Your Radar
- Jul 13Congress returns from recess. Highway bill fight resumes before Sept 30 deadline
- Sep 4, 2026NASTT Canadian Project of the Year deadline. Trenchless project entries due for No-Dig North 2026
- Sep 30, 2026Surface transportation funding lapses. $580B highway bill needs Congress action
- Oct 2026Alberta pipeline national interest decision target. Federal designation point for West Coast pipeline
- Jul 1, 2027Ontario Type 2 hard hat rule takes effect. Side-impact-rated hard hats become mandatory
Get The Field Report
The week in oil & gas and heavy construction: market data, the big story, and where the work is. Every Sunday, in 60 seconds.
You're in. The Field Report lands Sunday.
Look for it in your inbox Sunday morning.
Something went wrong. Please try again.
Free, no spam, unsubscribe anytime.
