Balfour Beatty Tops Out $385M Grand Hyatt Miami Beach
Balfour Beattyโs U.S. arm has topped out the Grand Hyatt Miami Beach, an 800-room, 17-story hotel adjacent to the Miami Beach Convention Center, Construction Dive reports. The $385 million project, announced July 30, includes 12 floors of guest rooms, 110,000 square feet of meeting and ballroom space across four floors, 17,000 square feet of retail, and a climate-controlled skybridge connecting the hotel directly to the convention center. Balfour Beatty won the contract in 2023 from developers Terra Group and Turnberry, but construction didnโt break ground until April 2025. The milestone comes as the broader hotel construction market has cooled through the second quarter of 2026, though Miamiโs hospitality sector has continued recovering post-pandemic.
What It Means for Subcontractors
- The skybridge connector and 110,000 square feet of ballroom/meeting space represent significant remaining scope for MEP, glazing, and structural steel subs as the project moves from topping-out toward interior buildout and enclosure.
- Curtain wall and glazing contractors should note the panoramic view requirements across 12 floors of guest rooms plus the rooftop โgrand lawnโ amenity deck, both likely driving specialized facade and waterproofing packages.
- With Balfour Beatty as GC on a project this size, subs in electrical, HVAC, and finish trades should track upcoming buildout packages given the four-floor event space and 17,000 square feet of retail still to be built out.

