Presidential Permit

A U.S. federal authorisation required for cross-border infrastructure like pipelines or transmission lines at the Canada-U.S. boundary. Subcontractors on these projects cannot mobilise or break ground until the permit is secured. Delays in approval directly impact your project schedule and contract start dates.

Related Terms

Induced Seismicity

Compliance

Human-caused ground tremors triggered by oilfield operations like hydraulic fracturing or wastewater disposal. Regulators may issue stop-work orders, directly halting your field operations. Subcontractors should track local seismic thresholds, as exceeding them can suspend permits and delay project timelines.

Chain-Of-Custody

Compliance

A documented record tracking who handled materials, samples, or equipment at every stage of a job. Subcontractors must maintain this trail to prove proper handling and avoid liability disputes. It is commonly required for soil samples, hazardous materials, and serialised equipment.

Hazard Assessment

Compliance

A formal process where subcontractors identify and evaluate site-specific risks before work begins. It documents potential dangers, required controls, and responsible parties. Most client operators require a completed hazard assessment before issuing a work permit.

CIH (Certified Industrial Hygienist)

Compliance

A credentialed professional who assesses and controls workplace health hazards such as chemical exposure, noise, and air quality. Subcontractors may be required to retain or consult a CIH to meet site entry or regulatory requirements. Their sign-off can be mandatory before work begins in confined spaces or hazardous environments.

LDAR (Leak Detection and Repair)

Compliance

A regulated programme requiring subcontractors to inspect equipment for fugitive emissions using specialised tools like optical gas imaging cameras. Findings must be documented and repaired within set timeframes under federal and provincial regulations. Field crews performing LDAR work often require specific training and certification to stay compliant on site.

Protest (customs)

Compliance

A formal dispute filed against a customs ruling, such as import duties charged on tools or equipment crossing the border. Subcontractors use protests to recover overbilled duties on temporarily imported gear. Filing deadlines are strict, so act quickly after receiving a customs decision.

Stay sharp on field operations

Industry news and insights, delivered to your inbox.

Subscribe to FieldNews
A community project by Aimsio