Prefabrication

The assembly of piping, structural, or mechanical components in a controlled shop environment before site installation. Subcontractors often bid prefab scope separately from field installation work. It can reduce on-site labour hours and shorten project schedules.

Related Terms

Drilling Optimisation

Industry

The process of improving drilling speed, efficiency, and cost performance on a well. Subcontractors may be asked to adjust crew rotations, equipment deployment, or service timing to support optimisation targets. Faster drilling cycles can shorten contract durations, affecting your crew planning and invoicing schedules.

SAGD (Steam Assisted Gravity Drainage)

Industry

A heavy oil extraction method using paired horizontal wells where steam is injected into the upper well to heat bitumen, allowing it to drain by gravity to the lower production well. Creates specialized maintenance and service opportunities for subcontractors in steam generation equipment, wellhead systems, and pipeline infrastructure at oil sands operations.

Tank Farm

Industry

A designated site containing multiple large storage tanks for oil, gas, or chemicals. Subcontractors frequently perform inspection, maintenance, and cleaning work at these facilities. Access permits and confined space certifications are typically required on site.

Tieback

Industry

A structural anchor or connection point used to secure equipment, pipelines, or wellheads back to an existing infrastructure system, commonly referenced in subcontractor scopes of work when connecting new installations to live or existing lines. Subcontractors should confirm tieback specifications and isolation procedures clearly in their contracts, as this work often involves elevated risk and may require additional certifications or permits.

Multi-Well Pad

Industry

A single surface location where multiple wells are drilled and completed in sequence. For subcontractors, this means extended site presence, higher mobilisation value, and repeated service cycles from one location. Scheduling and crew continuity are critical to securing ongoing work across the pad.

Long-Lead Items

Industry

Equipment or materials requiring extended procurement timelines, often months ahead of project start. Subcontractors must identify these early to avoid costly schedule delays. Late orders can stall mobilisation and trigger liquidated damages clauses.