IndustryGlossary Term

Perforated Interval

The section of casing or liner that has been shot through with charges to allow hydrocarbons to flow into the wellbore. Subcontractors working completions or workovers need to know the perforated interval to plan fluid placement and tool runs accurately.

Related Terms

Cold-Milled Asphalt

Industry

Reclaimed pavement material produced by grinding existing asphalt surfaces without heat. Subcontractors encounter it during road restoration work on well pads, pipeline rights-of-way, and industrial sites. It is commonly reused as base material, reducing disposal costs and material haul-off requirements.

Work Order

Industry

A formal document issued by a client or general contractor authorising a subcontractor to perform a specific scope of work. It outlines the job details, location, timeline, and agreed rate. Subcontractors typically cannot invoice without a valid work order number.

Parcel

Industry

A defined section of land or a lease area assigned to a specific project or operator. Subcontractors may be scoped and mobilised by parcel, affecting billing boundaries and crew deployment zones.

MCF (Thousand Cubic Feet)

Industry

Standard unit for measuring natural gas volumes, equal to 1,000 cubic feet. Subcontractors use MCF to interpret production targets, scope work, and align service pricing on gas well projects. Billing rates and throughput bonuses are often tied directly to MCF volumes.

Shale Gas

Industry

Natural gas extracted from shale rock formations using hydraulic fracturing and horizontal drilling. For subcontractors, shale gas projects drive high demand for frac crews, equipment operators, and site services. Work is often concentrated in multi-well pad campaigns, creating steady but intense mobilisation cycles.

Preconstruction

Industry

The planning phase before field work begins, covering scope review, site assessments, and schedule alignment with the GC. Subcontractors are often engaged during this phase to provide pricing, labour forecasts, and constructability input. Early involvement can improve mobilisation timelines and reduce costly scope changes later.